Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> be submitted to the City's Representative for determination of general conformance to the <br /> design concept and the construction Contract. Should City elect to refuse the substitution, <br /> Contractor agrees to pay such royalties and secure such valid licenses as may be requisite <br /> for the City, its officers, agents and employees or any of them, to use such invention, article, <br /> material or appliance without being disturbed or in any way interfered with by any proceeding <br /> in law or equity on account thereof. <br /> Costs involved in fees, royalties, or claims for any patented invention, article, process or <br /> method that may be used upon or in a manner connected with the Work under this Contract <br /> or with use of completed Work by the City shall be paid by the Contractor. The Contractor <br /> and its sureties shall protect and hold the City, and City's Representative, together with its <br /> officers, agents, and employees, harmless from any and all loss, defense cost, and expenses <br /> and against any and all demands made for such fees or claims brought or made by the holder <br /> of any invention or patent. Before final payment is made on the account of this Contract, the <br /> Contractor shall, if requested by the Owner, furnish acceptable proof of a proper release from <br /> all such fees or claims. <br /> 1-10 TEMPORARY TRAFFIC CONTROL <br /> 1-10.1 General <br /> 1-10.1(2) Description <br /> Supplement 1-10.1(2) as follows: <br /> The Contractor shall provide a uniformed off-duty Police Officer to control traffic for <br /> work at signalized intersections and other critical situations as determined by the <br /> Engineer. <br /> 1-10.2 Traffic Control Management <br /> 1-10.2(1) General <br /> Delete the first sentence of the third paragraph of 1-10.2(1) and substitute the following: <br /> The primary and alternate TCS shall be certified as worksite traffic control <br /> supervisors by one of the organizations listed below: <br /> • Evergreen Safety Council (800) 521-0778 <br /> • Northwest Laborers Union (800) 240-9112 <br /> • American Traffic Safety Services Association (877) 642-4637 <br /> 1-10.2(2) Traffic Control Plans <br /> Delete the first paragraph of 1-10.2(2) and substitute the following: <br /> Contractor may use City's Standard Traffic Control Plans included in COE Standard <br /> Drawings, Series 700. The City does not represent or warrant that the Standard <br /> Plans are sufficient, adequate or complete for the Contractor's means, methods or <br /> plan of Work. If a new or additional Traffic Control Plan is necessary, prepare <br /> detailed Traffic Control Plan complying with COE Standard Drawings, Series 700, <br /> the MUTCD, Part 6, and the most current edition of the PROWAG (Public Rights- <br /> of-Way Accessibility Guidelines). Plan preparation shall be at Contractor's sole cost <br /> and submitted to the City for approval at least 14 calendar days before starting <br /> Work. Work may not begin until Contractor is in receipt of City approved Traffic <br /> Control Plan. <br /> 1-10.3 Traffic Control Labor, Procedures and Devices <br /> Delete 1-10.3 and substitute the following: <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-127 <br />