My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor shall provide and install the signs and sign posts. The signs shall be <br /> maintained by the Contractor until construction operations are complete. When the <br /> project includes striping by the Contractor, the signs and posts shall be removed by the <br /> Contractor when the no passing zones are re-established by striping. <br /> When the Contractor is not responsible for striping, the signs and posts shall be removed <br /> by the Contractor when the "No Passing Zones" are re-established by striping. Payment <br /> to perform the Work required for this subsection will be under the item "Maintenance and <br /> Protection of Traffic Control." <br /> 1-10.3(4) Traffic Control Labor <br /> The Contractor shall furnish all personnel for flagging to control traffic during construction <br /> operations. Flaggers shall have a current certification (Flagging Card) from the State <br /> Department of Labor and Industries (WAC 296-155-305). Employees of the Contractor <br /> engaged in flagging or traffic control shall wear reflective vests and hard hats. During <br /> hours of darkness, white coveralls or white or yellow rain gear shall also be worn. The <br /> vests and other apparel shall be in conformance with Section 1-07.8. The Contractor <br /> shall furnish the MUTCD standard Stop/Slow paddles, except the minimum width shall <br /> be 24-inches, for the flagging operations. During hours of darkness flagger stations shall <br /> be illuminated to insure that flaggers can be easily seen without causing glare to the <br /> traveling public. The Contractor shall develop and use a method to ensure that flaggers <br /> have adequate warning of objects approaching from behind the flagger. <br /> All flaggers shall start a new job with an on-site orientation. This orientation must <br /> include, but not be limited to, the flagger's role and location on the job site, equipment, <br /> traffic patterns, communications and hazards specific to the work site. <br /> If off-duty uniformed police officers are not available for traffic control for Work within <br /> signalized intersections, Contractor may provide four flaggers. Flaggers are not <br /> permitted within the intersection. Each flagger shall control only one approach and be <br /> stationed near the stop bar. Provide a minimum of a series of three warning signs in <br /> advance of each flagger. Narrow multi-lane approaches to a single lane approaching <br /> the flagger. Provide and require all flaggers use two-way radios to signal each other to <br /> prevent conflicts and hold traffic when construction activities require. <br /> When the Bid proposed includes an item for "Traffic Control Labor," the Work covered <br /> by this item shall be for the labor actually used when authorized by the Engineer for: <br /> 1. The services of flaggers at both ends of a 2-way, single lane operation; or <br /> 2. The services of flaggers at signalized intersections if off-duty uniformed police <br /> officers are not available, or when otherwise specifically directed by the <br /> Engineer. <br /> The hours eligible for"Traffic Control Labor" shall be for the hours actually worked, plus <br /> 1 hour of on-site orientation per flagger. "Show-up time" will not be counted. The labor <br /> to perform the Work described in the item "Maintenance and Protection of Traffic Control" <br /> is specifically excluded from this Work. No adjustment will be made to the unit price for <br /> "Traffic Control Labor" for overtime or holiday hours worked. <br /> 1-10.3(4)A Traffic Control - Off-Duty Police Officer <br /> Contractor shall provide off-duty uniformed Police Officer for traffic control at all <br /> signalized intersections. Acceptable sources for off-duty uniformed Police Officers <br /> are as follows in order of preference: <br /> 1. City of Everett Police Department, contact either, <br /> a. Officer Mike Bernardi, (425) 327-9119 <br /> b. Officer Mike Drake, (425) 244-0025 <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.