My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 2 — EARTHWORK <br /> 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP <br /> 2-01.2 Disposal of Usable Material and Debris <br /> Supplement 2-01.2 by adding the following: <br /> When requested by the property owner, trim trees of sufficient size for fire wood, cut into <br /> two-foot rounds and neatly stack on their property. Remove and dispose of stumps, <br /> large roots, limbs and branches. <br /> 2-01.2(1) Disposal Method No.1 — Open Burning <br /> Delete 2-01.2(1). <br /> 2-01.4 Measurement <br /> Delete all paragraphs of 2-01.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-01.5 Payment <br /> Delete all paragraphs in 2-01.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> If there is no bid item to cover clearing and grubbing, then clearing and grubbing shall <br /> be included with other work with no direct compensation made. <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br /> 2-02.1 Description <br /> Delete 2-02.1 and substitute the following: <br /> The Work shall consist of the removal, disposal or abandoning in-place of various <br /> existing improvements including, but not limited to, pavements, structures, pipe, curbs, <br /> curb and gutter, gutter, valves, manholes, inlets, catch basins, trees and other items <br /> necessary for the accomplishment of the improvement. <br /> 2-02.3 Construction Requirements <br /> 2-02.3(2) Removal of Bridges, Box Culverts and Other Drainage Structures <br /> Supplement 2.02.3(2) by adding the following: <br /> When removing structures such as manholes, inlets, or vaults that interfere with the <br /> construction, properly plug all pipe openings abandoned in-place watertight with <br /> Commercial Concrete in accordance with 2-02.3(5). <br /> Backfill voids with suitable job excavated material where structures are removed. <br /> Compact suitable backfill material in accordance with 2-03.3(14)C. <br /> If the Engineer determines the job-excavated material unsuitable for backfill then <br /> Contractor shall obtain Gravel Borrow or CDF as directed, to complete backfilling <br /> the voids. If a pay item for Gravel Borrow or CDF is not included in the Proposal, <br /> then providing Gravel Borrow or CDF for backfill shall be considered as Extra Work <br /> under 1-04.4. <br /> 2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters <br /> Delete 2-02.3(3) and substitute the following: <br /> Jackson Park Area Stormwater Separation Division 2—EARTHWORK September 2020 <br /> WO No. - UP3703 SP—133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.