My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 7-05 MANHOLES, INLETS, AND CATCH BASINS <br /> 7-05.1 Description <br /> Revise the first paragraph in 7-05.1 to read as follows: <br /> This Work consists of constructing manholes, inlets, drywells, and catch basins and <br /> connecting to existing Structures of the types and sizes designated in accordance with <br /> the Plans, these Special Provisions, the Specifications, and the COE Standard <br /> Drawings, in conformity with the lines and grades staked. <br /> Further Supplement 7-05.1(1) as follows: <br /> 7-05.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> Provide shop drawings for all type 2 catch basins for engineer review and approval. <br /> 7-05.2 Materials <br /> Supplement 7-05.2 by adding the following at the end of the material list: <br /> Mortar, nonshrink 9-20.3(2) Standard Specifications <br /> Commercial Concrete 6-02.3(2)B Standard Specifications <br /> Watertight Connection Boots 9-04.12 Special Provisions <br /> Flexible Couplings 9-04.13 Special Provisions <br /> Polypropylene Manhole Steps 9-05.64 Special Provisions <br /> & Hand Holds <br /> Polypropylene Manhole Ladder 9-05.66 Special Provisions <br /> 7-05.3 Construction Requirements <br /> Supplement 7-05.3 by adding the following after the last sentence of the third paragraph: <br /> Install PAMREX, East Jordan Iron Works, or equal, hinged manhole frame and cover in <br /> accordance with manufacturer recommendations and applicable City standards and <br /> details. <br /> Coordinate manhole cover and frame hinge location with manhole steps and traffic <br /> lanes. Hinge orientation to be determined during the shop drawing review of precast <br /> manhole structures. <br /> Delete the tenth paragraph in 7-05.3. <br /> Revise the last sentence in the sixteenth paragraph in 7-05.3 to read as follows: <br /> Provide manholes, inlets, and catch basins that upon final acceptance of the Work <br /> conforms to the following COE Standard Drawings requirements: <br /> 1. Manholes No. 605, 606 and 607 as applicable. <br /> 2. Inlets No. 401 <br /> 3. Catch Basins No. 402, 403 and 405 as applicable. <br /> 7-05.3(1) Adjusting Manholes and Catch Basins to Grade <br /> Delete both paragraphs of 7-05.3(1) and substitute the following: <br /> Adjust manholes, catch basins and other structures to final grade after completing <br /> pavement operations. Carefully re-establish the center of each structure from <br /> Contractor's previously established references. <br /> Cut pavement in neat circle having a minimum diameter of 2-feet beyond the casting <br /> cover. Remove pavement and base material, maintaining the neat circle, to permit <br /> casting and frame removal. Adjust casting and frame to proper grade. <br /> Place cast iron frame on concrete blocks or concrete adjusting rings and wedge up <br /> to the desired grade using plastic wedges. Wood or metal wedges are not allowed. <br /> Jackson Park Area Stormwater Separation September 2020 <br /> WO No. -UP3703 Division 7—STORM, SEWER,WATER <br /> SP-155 <br />
The URL can be used to link to this page
Your browser does not support the video tag.