Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Protect the driveway against damage or defacement until acceptance by Owner. <br /> Remove and replace by the Contractor at his expense driveways that are not acceptable, <br /> in the opinion of the Engineer, because of damage or defacement. <br /> Before placing any concrete, have on the job site enough protective paper, or equivalent, <br /> to cover the pour of an entire day in the event of rain or other unsuitable weather <br /> conditions. <br /> 8-06.4 Measurement <br /> Delete paragraphs in 8-06.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> 8-06.5 Payment <br /> Delete all paragraphs in 8-06.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-12 Chain Link Fence and Wire Fence <br /> 8-12.2 Materials <br /> Supplement 8-12.2 with the following: <br /> Fence materials shall match the material, color, size, shape and finish of the existing <br /> fencing material to the extent that such can be accomplished using materials consistent <br /> with Section 9-16 of the Standard Specifications. <br /> 8-12-.3 Construction Requirements <br /> Supplement 8-12.3(1) with the following: <br /> Posts, tension wire, and fabric for chain link fence shall be selected and installed to <br /> match the existing fencing on site to the extent that such is consistent with the <br /> requirements herein. Corner posts shall be installed at all connections to the existing <br /> fence. Existing fence fabric and tension wire shall be trimmed, connected to the new <br /> post, and re-tensioned to meet the requirements for new fence as indicated herein. <br /> 8-12.4 Measurement <br /> Delete all paragraphs in 8-12.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 8-12.5 Payment <br /> Delete all paragraphs in 8-12.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Jackson Park Area Stormwater Separation September 2020 <br /> WO No. -UP3703 Division 8—MISC CONSTRUCTION <br /> SP-173 <br />