Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 8-13 MONUMENTCASES <br /> Delete Section 8-13 and substitute the following: <br /> 8-13 SURVEY MONUMENTS AND CASES <br /> (******) <br /> 8-13.1 Description <br /> This Work shall consist of furnishing and placing monument cases or survey monuments and <br /> monument cases with covers. This Work will also include adjusting existing survey <br /> monument cases to grade in accordance with COE Standard Drawing No. 323, 324, 325 and <br /> these Special Provisions. <br /> 8-13.2 Materials <br /> Provide Class 30 cast iron monument case and riser section in accordance with ASTM —A48 <br /> with bituminous coating. <br /> Provide cast iron cover with bituminous coating and integrally cast letters conforming to COE <br /> Standard Drawing No. 323 and 324. <br /> Provide Commercial grade cement concrete. <br /> 8-13.3 Construction Requirements <br /> 8-13.3(1) Survey Monuments <br /> Provide the survey monuments, including case and cover, as called for on the Plans and <br /> in these Special Provisions. <br /> City has made reasonable effort to identify existing survey monuments on the Plans. <br /> Notify the Engineer immediately if survey monuments are unexpectedly encountered in <br /> the area of the Work. <br /> Perform survey monument work using a professional land surveyor licensed in the State <br /> of Washington under the provisions of RCW 18.43.020and conforming to the <br /> requirements of RCW 58.09.120 and 58.09.130 and COE Standard Drawing No. 313. <br /> Remove and replace GLO or Geodetic Control monuments in conformance with the <br /> requirements of WAC 332-120. Complete the requirements for referencing monuments <br /> to the NAD 83-91 horizontal datum by completing a control survey that references the <br /> City's NAD 83-91 survey control monuments. Obtain City Surveyor approval for this <br /> control survey procedure and reference monument selection prior to beginning this work. <br /> The Contractor's surveyor is required to fill out and submit necessary paperwork to <br /> Washington DNR prior to removing a survey monument. Record survey field notes for <br /> the control survey in a City supplied field book and return to the Engineer at the <br /> completion of the work. The surveyor shall stamp his surveyor's license number as <br /> required in RCW 58.09.120 on the brass cap of each monument set. The surveyor shall <br /> also stamp the City supplied monument number on each monument set. Coordinate <br /> monument survey work with and obtain Engineer approval before final City approves the <br /> final payment. <br /> Carefully protect reference points to the monuments and take necessary precaution to <br /> avoid destruction of the points. Re-set lost or destroyed reference points at Contractor's <br /> expense. <br /> 8-13.3(2) Furnish and Place Monument Castings <br /> Provide monument cases and covers where indicated on the Plans, or where designated <br /> by the Engineer, in accordance to COE Standard Drawing No. 323 and 324. <br /> 8-13.3(3) Adjust Existing Monument Castings to Grade <br /> Adjust existing monument castings to grade in the same manner as for manholes in 7- <br /> 05.3(1) of these Special Provisions. <br /> Jackson Park Area Stormwater Separation September 2020 <br /> WO No. -UP3703 Division 8—MISC CONSTRUCTION <br /> SP-174 <br />