CITY OF EVERETT SPECIAL PROVISIONS <br /> 8-13.4 Measurement <br /> Delete all paragraphs in 8-13.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> 8-13.5 Payment <br /> Delete all paragraphs in 8-13.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-14 CEMENT CONCRETE SIDEWALKS <br /> 8-14.2 Materials <br /> Supplement 8-14.2 by adding the following: <br /> Chemical Admixtures for Concrete 9-23.6 Special Provisions <br /> 8-14.3 Construction Requirements <br /> Supplement 8-14.3 by adding the following: <br /> Provide concrete mix with slump not exceeding 3-1/2 inches. <br /> Add coloring agent for matching the color of newly constructed cement concrete <br /> sidewalks to the color of adjacent existing cement concrete sidewalks. Add to the <br /> concrete during mixing in an amount not to exceed 1-1/2 pounds per cubic yard of <br /> concrete. Do NOT use coloring agent in curb ramps. <br /> 8-14.3(1) Excavation <br /> Supplement 8-14.3(1) by adding the following: <br /> Obtain approval of the Engineer to provide, place and compact Gravel Borrow <br /> meeting the requirements of 9-03.14 of the Standard Specification if there is <br /> insufficient suitable native material on the Project to fill low areas for the sidewalk <br /> subgrade. <br /> 8-14.3(2) Forms <br /> Supplement 8-14.3(2) by adding the following: <br /> Before setting the forms, grade the subgrade to two inches below established grade <br /> to accommodate two inches of crushed surfacing top course. <br /> Install sidewalk drains prior to placing forms if the Plans calls for sidewalk drains or <br /> the Engineer directs installation of sidewalk drains. <br /> 8-14.3(3) Placing and Finishing Concrete <br /> Supplement 8-14.3(3) by adding the following: <br /> Form joints by first cutting a groove in the concrete with a tee bar of a depth equal <br /> to, but not greater than the joint filler material, and then work the premolded joint <br /> filler into the groove. Position premolded joint filler for through and contraction joints <br /> in true alignment at right angles to the line of the sidewalk and be normal to and <br /> flush with the surface. <br /> Edge joints using a 1/4-inch radius edger and tool the sidewalk edges using a 1/2- <br /> inch radius edger. <br /> Obtain Engineer's approval of placing and finishing tools. Perform the concrete <br /> sidewalk placing and finishing under the control of the Engineer. Provide finished <br /> Jackson Park Area Stormwater Separation September 2020 <br /> WO No. -UP3703 Division 8—MISC CONSTRUCTION <br /> SP-175 <br />