Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 8-14.4 Measurement <br /> Delete all paragraphs in 8-14.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> 8-14.5 Payment <br /> Delete all paragraphs in 8-14.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-21 PERMANENT SIGNING <br /> 8-21.1 Description <br /> Supplement 8-21.1 by adding the following: <br /> Work involving installing traffic regulatory signs shall be in accordance with COE <br /> Standard Drawing 716 and street name signs in accordance with COE Standard <br /> Drawing 715 and 718 and as indicated on the Plans. <br /> 8-21.3 Construction Requirements <br /> 8-21.3(4) Sign Removal <br /> Delete 8-21.3(4) and substitute the following: <br /> Remove the existing signs and, if so indicated, the sign structures where shown in <br /> the Plans or ordered by the Engineer. Where indicated, remove concrete pedestals <br /> to a minimum of 1 foot below finished grade and backfill the hole to the satisfaction <br /> of the Engineer. After removing an existing sign post within a sidewalk area, finish <br /> the area to make the sidewalk continuous. Remove and properly dispose of wood <br /> signs, wood sign posts, wood structures, metal sign posts, wind beams, and other <br /> metal structural members. Salvage aluminum signs and return to the City of <br /> Everett's Public Works Department. <br /> 8-21.4 Measurement <br /> Delete all paragraphs in 8-21.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> 8-21.5 Payment <br /> Delete all paragraphs in 8-21.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-22 PAVEMENT MARKING <br /> Supplement 8-22 with the following: <br /> 8-22.2 Materials <br /> All plastic marking shall be Type D. <br /> Jackson Park Area Stormwater Separation September 2020 <br /> WO No. -UP3703 Division 8—MISC CONSTRUCTION <br /> SP-177 <br />