My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 8-22.3 Construction Requirements <br /> Pavement markings shall be installed in accordance with Section 8-22.3 of the Standard <br /> Specifications with the following modifications: <br /> 1) All Stop Line shall be 24" wide Type D extruded plastic flat line. Spray Type D is not <br /> allowed. <br /> 2) All Crosswalk Line shall be solid white lines, 24" wide, installed in accordance with <br /> City of Everett Standard Drawing No. 721 and shall be Type D extruded plastic flat <br /> line. Spray Type D is not allowed. <br /> 3) All two-way left turn yellow lines and lane lines dividing two opposing directions of <br /> travel shall be Type D plastic flat line. <br /> 4) Profiled plastic Type D material, where called for in the Appendices to the Special <br /> Provisions, shall be used for lane line dividing traffic in the same direction of travel <br /> including plastic skip white lane line, and solid white edge line, or other lines staked <br /> by the Engineer. <br /> 5) All white parking lines shall be paint line. <br /> 6) All wide line and dotted extension line shall be Type D plastic flat line. <br /> 7) All plastic sharrows and plastic bicycle lane symbols shall be Type B Pre-formed <br /> Fused Thermoplastic. <br /> 8) Access parking space symbols, arrows, letters, bicycle symbols, and speed hump <br /> symbols shall be Type D extruded plastic flat line. Spray Type D is not allowed. <br /> 8-22.4 Measurement <br /> Delete all paragraphs in 8-22.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> 8-22.5 Payment <br /> Delete all paragraphs in 8-22.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> Jackson Park Area Stormwater Separation September 2020 <br /> WO No. -UP3703 Division 8—MISC CONSTRUCTION <br /> SP—178 <br />
The URL can be used to link to this page
Your browser does not support the video tag.