CITY OF EVERETT SPECIAL PROVISIONS <br /> loose and disturbed materials below pipe grade to undisturbed earth and recompact <br /> the material in accordance with Division 2. <br /> 8-31.3(5)C Control of Alignment and Grade <br /> Employ appropriate equipment and methods to attain the specified alignment and <br /> grade and to prevent over-mining or excessive jacking friction. Allowable grade <br /> deviations in horizontal and vertical alignments will be no greater than 0.2 feet per <br /> 100 feet in the vertical or horizontal direction over the length of the jacking and <br /> boring to a maximum deviation of 0.5 feet. Upon completion of installation of the <br /> steel casing, allow the Engineer to inspect the alignment and grade. If Engineer <br /> notes irregularities, then implement corrective measures to re-establish design <br /> grade and alignment of the carrier pipe. <br /> 8-31.3(6) Installation of Carrier Pipe <br /> Install carrier pipe in the casing pipe using heavy duty casing spacers at spacing not <br /> less than that recommended by spacing manufacturer. <br /> 8-31.3(7) End Seals <br /> Provide water and soil tight end seals using synthetic rubber sleeves. Attach one sleeve <br /> to the casing pipe at one end and another sleeve at the carrier pipe at the other end. <br /> Use stainless steel band clamps for attaching sleeves. <br /> 8-31.3(8) Subsurface Obstructions <br /> In preparing the Bid and planning and executing the boring and jacking work, assume <br /> that subsurface obstructions other than those shown on the Plans may be encountered <br /> during the Work. Be prepared to remove or otherwise address such obstructions at no <br /> additional cost to the City. In the event the Contractor, through diligent effort, is unable <br /> to advance the boring and jacking due to significant or impassable obstructions, <br /> Contractor may abandon the cased hole and Engineer may direct Contractor to either <br /> relocate the alignment or to terminate the boring and jacking effort. Failure to advance <br /> the boring and casing jacking due to adverse soil or groundwater conditions, mechanical <br /> failures, undersized equipment or inept operator actions will not be considered an <br /> impassable obstruction. <br /> 8-31.3(9) Jacking and Receiving Pits <br /> The access pit locations and sizes for the boring and jacking work are shown on the <br /> Plans for planning and bidding purposes and are not intended to be binding on the <br /> Contractor. The Contractor may utilize alternative locations and sizes for access pits to <br /> the extent the Work is accomplished without adding complications or cost. <br /> Minimize, to the extent possible, the number and size of access pits used for boring and <br /> jacking work. <br /> Detour vehicle traffic and pedestrians safely around access pits in accordance with <br /> approved traffic control plans. Use concrete barriers, fences, or steel plates as <br /> necessary for safety. Backfill access pits in accordance with the requirements defined <br /> for trench backfill. <br /> 8-31.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> 8-31.5 Payment <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> Jackson Park Area Stormwater Separation September 2020 <br /> WO No. - UP3703 Division 8—MISC CONSTRUCTION <br /> SP-181 <br />