R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 8-31.3(1)B Certifications <br /> Furnish a certified affidavit of compliance of physical and chemical properties for <br /> the steel casing pipe specified in this section. <br /> 8-31.3(1)C Additional Approvals <br /> For Work within the BNSF right of way, a licensed professional engineer in the State <br /> of Washington shall prepare the Contractor's shoring and dewatering plans and <br /> submit to BNSF for review and approval. Obtain BNSF approval prior to beginning <br /> Work within the BNSF right of way. <br /> 8-31.3(2) Existing Site Conditions <br /> The City of Everett had limited soil borings performed near the location of the boring and <br /> jacking work. Soil boring log data performed for this Project, as well as soil information <br /> from other projects available to the Contractor are attached in Appendix G. <br /> The Contractor may perform additional subsurface investigations at his own expense. <br /> 8-31.3(3) Existing Facilities and Utilities <br /> Positively locate all utilities within five feet of the alignment. Contact the utility location <br /> service and confirm that all known buried utilities are clearly marked and identified prior <br /> to commencing excavations or boring and jacking operations in this Project area. <br /> 8-31.3(4) Welding Requirements <br /> Prequalify all welding procedures used to fabricate steel casings under the provisions of <br /> ANSI/AWS D1.1. Perform welding procedures for, but not necessarily limited to, <br /> longitudinal and girth or special welds for pipe cylinders, casing joint welds, reinforcing <br /> plates and grout coupling connections. Accomplish all welding using skilled welding <br /> operators and tackers having had adequate experience in the type of materials being <br /> used. Qualify welders used on the Project under the provisions of ANSI/AWS D1.1 by <br /> an independent local, approved testing agency not more than 6 months prior to <br /> beginning the casing work. <br /> Butt weld casing section joints in the field. Prepare each end of the casing for butt <br /> welding by providing 1/4-inch by 45-degree chamfer on the outside edges. <br /> 8-31.3(5) Installation of Steel Casing <br /> 8-31.3(5)A Jacking Head <br /> Provide steel jacking head having following requirements: <br /> a. Fit to the lead section of the casing in such a manner that it extends around <br /> the entire outer surface of the steel casing and projects at least 18 inches <br /> beyond the driving end of the casing. <br /> b. The jacking head shall not protrude more than 1/2 inch outside of the outer <br /> casing surface. <br /> c. Securely anchor head to prevent wobble or alignment variation during the <br /> boring or jacking operations. <br /> d. Carry out excavation entirely within the jacking head and not in advance <br /> of the head so as to minimize creation of voids outside the casing. <br /> 8-31.3(5)B Jacking Pit <br /> Provide heavy guide timber, structural steel, or concrete section of sufficient length <br /> to assure accurate control of the boring and jacking alignment. Provide adequate <br /> space within the excavation to permit insertion and welding of lengths of casing <br /> being bored and jacked. <br /> Prepare the rear jacking pit having a vertical surface to allow for tight sheeting or <br /> shoring sufficient to transfer the repetitive application of thrust of the jacking <br /> machine directly to the bearing soil. Upon completion of boring and jacking <br /> operations, prepare the bottom of the jacking pit as a pipe foundation. Remove all <br /> Jackson Park Area Stormwater Separation September 2020 <br /> WO No. -UP3703 Division 8—MISC CONSTRUCTION <br /> SP-180 <br />
The URL can be used to link to this page
Your browser does not support the video tag.