My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Shall: Required conduct. <br /> Shown: Refers to information presented on the Plans, with or without reference to the <br /> Plans. <br /> Specify: Refers to information described, shown, noted or presented in any manner in <br /> the Contract. <br /> Submittals: The information required by the Contract Documents provided by <br /> Contractor to the City's Representative or City. <br /> Total Float: The amount of time a given activity or path of activities may be delayed <br /> before it will affect the Completion Date. <br /> Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, <br /> wheelchairs, and equestrian traffic. <br /> Unabsorbed Overhead: The reduction or loss of contribution to recovery of the <br /> Contractor's Overhead costs realized by the result of reduced Project or Contractor <br /> billings, or both, due to any reason whatsoever, including a Project extension. <br /> Unit Price Work: Refers to items of Work identified by unit prices in the Proposal. <br /> 1-02 BID PROCEDURES AND CONDITIONS <br /> 1-02.1 Pre qualification of Bidders <br /> Delete 1-02.1 and substitute the following: <br /> 1-02.1 Bidder Responsibility Criteria <br /> (******) <br /> 1-02.1(1) Mandatory Bidder Responsibility Criteria <br /> (******) <br /> Bidder shall meet mandatory responsibility , criteria in accordance with RCW <br /> 39.04.350(1). The City may require the Bidder to submit documentation demonstrating <br /> compliance with the criteria under this 1-02.1(1). The Bidder must: <br /> 1. Registration. Have a current certificate of registration as a contractor in compliance <br /> with chapter 18.27 RCW, which must have been in effect at the time of Bid <br /> submittal; and <br /> 2. UBI. Have a current Washington Unified Business Identifier (UBI) number; and <br /> 3. State Requirements. If applicable: <br /> a. Have Industrial Insurance (workers' compensation) coverage for the bidder's <br /> employees working in Washington, as required in Title 51 RCW; <br /> b. Have a Washington Employment Security Department number, as required in <br /> Title 50 RCW; and <br /> c. Have a Washington Department of Revenue state excise tax registration <br /> number, as required in Title 82 RCW. <br /> 4. Disqualification. Not be disqualified from bidding on any public works contract <br /> under RCW 39.06.010 or 39.12.065(3). <br /> 5. Prevailing Wage Training. Unless Bidder has completed three or more public works <br /> projects and had a valid business license for three or more years, Bidder must have <br /> received Department of Labor and Industries training on the requirements related to <br /> public works and prevailing wage under RCW 39.12 and RCW 39.04. <br /> 5. Certification of Wage Compliance. Within the three-year period immediately <br /> preceding the date of the bid solicitation, not have been determined by a final and <br /> binding citation and notice of assessment issued by the department of labor and <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.