My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> more time for return of the documents, provided the City deems the circumstances <br /> warrant it. <br /> Supplement 1-03.3 by adding the following: <br /> A Contract shall not be formed until the Contract Documents are signed by the Mayor. <br /> 1-03.4 Contract Bond <br /> Revise 1-03.4 to read as follows: <br /> The Contractor shall provide a separate payment bond and performance bond, each in <br /> the amount of 100 percent of the Contract Sum and each in the form contained in the <br /> Contract Documents. These bonds shall serve as security for the faithful performance <br /> of the Work and as security for the faithful payment and satisfaction of the persons <br /> furnishing materials and performing labor on the Work. The bonds shall be issued by a <br /> corporation duly and legally licensed to transact surety business in the State of <br /> Washington. Such bonds shall remain in force throughout the period required to <br /> complete the Work, and thereafter for a period of 365 calendar days after Final <br /> Acceptance. The bonds must be executed by a duly licensed surety company, which is <br /> listed in the latest Circular 570 of the United States Treasury Department, as being <br /> acceptable as surety on federal bonds. No surety's liability on the bond shall exceed <br /> the underwriting limitations for the respective surety specified in Circular 570. The bonds <br /> must be signed by an officer of the Contractor empowered to sign binding instruments. <br /> The bonds must be accompanied by a fully executed and original power of attorney for <br /> the officer executing on behalf of the surety. The scope of the bonds or the form thereof <br /> prescribed in these Contract Documents shall in no way affect or alter the liabilities of <br /> the Contractor to the Owner as set forth in the Contract Documents. <br /> 1-03.5 Failure to Execute Contract <br /> Supplement 1-03.5 by adding the following: <br /> In addition to the items listed in the first paragraph of 1-03.5, failure to have or obtain a <br /> City of Everett business license prior to executing the Contract, unless immediately <br /> cured by Bidder after notice from the City, shall result in forfeiture of the proposal bond <br /> or deposit of this Bidder. <br /> 1-03.6 Return of Bid Deposit <br /> Supplement 1-03.6 by adding the following: <br /> Within 15 calendar days after the Bids are opened, the City will return the bid deposit <br /> accompanying the Bids that are not to be considered in making the Award. <br /> 1-03.7 Judicial Review <br /> Revise the first paragraph of 1-03.7 to read as follows: <br /> All protests by Bidders must be in accordance with Chapter 3.46 of the Everett Municipal <br /> Code, "Bid Protest Procedures." <br /> The exclusive venue of all lawsuits shall be in Snohomish County Superior Court. <br /> 1-03.8 Third Party Beneficiary <br /> Add 1-03.8 to read as follows: <br /> All Parties agree that the State of Washington shall be, and is hereby, named as an <br /> express third-party beneficiary of the contract, with full rights as such. <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP—51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.