My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> applicable and such additives and alternates as selected by the City, will be used by the <br /> City for Award purposes and to fix the awarded Contract Sum and the amount of the <br /> Contract Bond(s). <br /> Revise the third and fourth paragraphs of 1-03.1 to read as follows: <br /> Within 5 days after the opening of Proposals, a Bidder who wishes to claim error shall <br /> submit a notarized affidavit signed by the Bidder, accompanied by original work sheets <br /> used in the preparation of the Proposal, requesting relief from the responsibilities of <br /> Award. <br /> The affidavit shall describe the specific error(s) and certify that the work sheets are the <br /> originals used in the preparation of the Proposal. The Engineer will review the certified <br /> work sheets to determine the validity of the claimed error and make recommendation to <br /> the City. If the City concurs in the claim of error, the Bidder will be relieved of <br /> responsibility, and the bid deposit of the Bidder will be returned. Thereafter, at the <br /> discretion of the City, all Bids may be rejected, or Award made to next lowest and <br /> responsive Bidder. <br /> Supplement 1-03.1 by adding the following: <br /> 1-03.1(2) Preference for Resident Contractors <br /> (******) <br /> In accordance with RCW 39.04.380, if a Bid is received from a nonresident contractor <br /> from a state that provides a percentage bidding preference and does not have an office <br /> located in Washington, then a comparable percentage disadvantage will be applied to <br /> the Bid of that nonresident contractor. <br /> 1-03.2 Award of Contract <br /> Revise 1-03.2 to read as follows: <br /> Within 45 days after the opening of Bids, the City will act either to accept the Bid from <br /> the lowest responsive, responsible Bidder, or to reject all Bids. The City reserves the <br /> right to request extensions of such Bid acceptance period. If the lowest responsible <br /> Bidder and the City cannot agree on an extension by the 45 day deadline, the City <br /> reserves the right to award the Contract to the next lowest responsible Bidder or reject <br /> all Bids. <br /> The acceptance of a Bid will be evidenced by a written Notice of Award of Contract <br /> delivered in person or by certified mail to the Bidder whose Bid is accepted, together <br /> with a request to furnish a Contract Bond and evidence of insurance and to execute the <br /> Contract set forth in the Contract Documents. No Contract is formed until the Contract <br /> Execution Date. <br /> 1-03.3 Execution of Contract <br /> Revise the first paragraph of 1-03.3 to read as follows: <br /> Successful Bidder has 14 calendar days after receiving the Notice of Award to submit <br /> the following documents to the City: <br /> • Two executed copies of the Contract. <br /> • Two original payment bonds and two original performance bonds submitted on <br /> forms contained in Contract Documents. <br /> • Certificate of Insurance and additional insured endorsement in accordance with <br /> 1-07.18 "Insurance" of the Special Provisions. <br /> Revise the third paragraph of 1-03.3 to read as follows: <br /> If the Bidder experiences circumstances beyond their control that prevents return of the <br /> Contract Documents within 14-calendar days after the Award Date, the City may grant <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP—50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.