My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Public Works <br /> WASHINGTON <br /> ADDENDUM NO. 2 <br /> TO <br /> JACKSON PARK STORM WATER SEPARATION AND TREATMENT <br /> W.O. # UP-3703 <br /> OCTOBER 1, 2020 <br /> NOTICE TO PLANHOLDERS: <br /> Addendum No. 2 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 2 in the space provided on page SP-18 in <br /> Division P, Proposal Form. Failure to comply with this requirement may render the Bid non- <br /> responsive and may cause its rejection. <br /> This Addendum consists of 2 page, including all revisions, and attachments. <br /> The Bid date, time and location for receipt of Bids are unchanged by this Addendum. <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> Notice to Contractors—First sentence is revised to read: <br /> "Notice is hereby given that sealed bids for the JACKSON PARK AREA STORMWATER <br /> SEPARATION will be received at the Purchasing Counter, 3200 Cedar Street, Door#5, Everett, <br /> WA, 98201, until 2:00 p.m. on Tuesday, October 13, 2020." <br /> Bid Descriptions- <br /> Bid Item 17: PE Storm Drain Pipe, 24-Inch, page SP-8, shall be revised to read"PVC Storm <br /> Drain Pipe, 24-inch". See drawing C7 for more information. <br /> Bid Item 35: Force Account, page SP-12,Add to the list: "(e) Existing landscape trees along <br /> the frontage of Jackson Park that may need to be trimmed or replaced due to construction and <br /> restoration." <br /> Add Bid Item 36: SD Manhole 48-inch DIA Additional Height <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> In addition to the measurement per each, manhole in excess of 10 feet in height will be measured <br /> per linear foot for each additional foot of total height over 10 feet as measured from the flow line <br /> to the surface of the Work. <br /> The unit price per linear foot shall be full compensation for all labor, material,tools and equipment <br /> necessary to satisfactorily complete the Work as defined in these Contract Documents. <br /> Measurement of manhole height for payment purposes shall be the distance from the flowline of <br /> the outlet pipe to the surface of the Work measured to the nearest foot. <br /> Addendum 2 Page 1 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax(425)257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.