Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Public Works <br /> WASHINGTON <br /> ADDENDUM NO. 2 <br /> TO <br /> JACKSON PARK STORM WATER SEPARATION AND TREATMENT <br /> W.O. # UP-3703 <br /> OCTOBER 1, 2020 <br /> NOTICE TO PLANHOLDERS: <br /> Addendum No. 2 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 2 in the space provided on page SP-18 in <br /> Division P, Proposal Form. Failure to comply with this requirement may render the Bid non- <br /> responsive and may cause its rejection. <br /> This Addendum consists of 2 page, including all revisions, and attachments. <br /> The Bid date, time and location for receipt of Bids are unchanged by this Addendum. <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> Notice to Contractors—First sentence is revised to read: <br /> "Notice is hereby given that sealed bids for the JACKSON PARK AREA STORMWATER <br /> SEPARATION will be received at the Purchasing Counter, 3200 Cedar Street, Door#5, Everett, <br /> WA, 98201, until 2:00 p.m. on Tuesday, October 13, 2020." <br /> Bid Descriptions- <br /> Bid Item 17: PE Storm Drain Pipe, 24-Inch, page SP-8, shall be revised to read"PVC Storm <br /> Drain Pipe, 24-inch". See drawing C7 for more information. <br /> Bid Item 35: Force Account, page SP-12,Add to the list: "(e) Existing landscape trees along <br /> the frontage of Jackson Park that may need to be trimmed or replaced due to construction and <br /> restoration." <br /> Add Bid Item 36: SD Manhole 48-inch DIA Additional Height <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> In addition to the measurement per each, manhole in excess of 10 feet in height will be measured <br /> per linear foot for each additional foot of total height over 10 feet as measured from the flow line <br /> to the surface of the Work. <br /> The unit price per linear foot shall be full compensation for all labor, material,tools and equipment <br /> necessary to satisfactorily complete the Work as defined in these Contract Documents. <br /> Measurement of manhole height for payment purposes shall be the distance from the flowline of <br /> the outlet pipe to the surface of the Work measured to the nearest foot. <br /> Addendum 2 Page 1 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax(425)257-8882 <br />