Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 6-02 Concrete Structures <br /> 6-02.3(13) Expansion Joints-Shop Drawings <br /> 6-02.3(16) Plans for Falsework and Forms-Shop Drawings <br /> 6-02.3(26)A Shop Drawings <br /> 6-03 Steel Fabrications or Structures <br /> 6-03.3(7) Shop Plans <br /> 6-03.3(25) Welding and Repair Welding-Shop Drawings <br /> DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br /> SEWERS, WATER MAINS, AND CONDUITS <br /> 7-04 Storm Sewers <br /> 7-04.2 Materials-Catalog Cuts or Standard Plans <br /> 7-05 Manholes, Inlets, Catch Basins, and Drywells <br /> 7-05.2 Materials-Catalog Cuts or Standard Plans <br /> 7-17 Sanitary Sewer Pipe (cut and cover) <br /> 7-17.2 Materials-Catalog Cuts or Standard Plans <br /> DIVISION 8 MISCELLANEOUS CONSTRUCTION <br /> 8-31 Bore and Jack Casing and Carrier Pipe <br /> 8-11.2 Materials-Standard Plans, Work Plan <br /> Deviations from Standard Plans will be subject to a Working Drawing submitted by the <br /> Contractor and approved by the Engineer. Where a Working Drawing is required by the <br /> Specifications, related Work performed prior to completion of the Engineer's review of <br /> the pertinent submission will be the sole expense and responsibility of the Contractor. <br /> Supplement 1-05.3 by adding the following: <br /> 1-05.3(1) Submittals <br /> Where required by the Contract Documents, the Contractor shall submit information, <br /> such as Working Drawings that will enable the City's Representative to advise the City <br /> whether the Contractor's proposed materials, Equipment or methods of work are in <br /> general conformance to the design concept and in compliance with the Plans and <br /> Specifications. Approval or acceptance of a Submittal does not relieve Contractor from <br /> complying with Contract requirements. The City's approval of a Submittal does not <br /> constitute a waiver of the Contract requirements. The City will not be obligated to accept <br /> or pay for Work performed by the Contractor that may be affected by materials, <br /> Equipment, or methods of work not submitted in a timely manner so that final review can <br /> be accomplished before the affected Work is complete. The City shall not be responsible <br /> for Delays, inefficiencies, or any additional costs or expenses caused in whole or in part <br /> by Contractor's failure to submit required information in sufficient time for review, <br /> comment, and correction. Contractor's failure to submit required information in sufficient <br /> time for review, comment and correction shall be deemed a waiver of any and all <br /> Contract Claims for adjustment of Contract Sum or Contract Time arising out of, or <br /> related to, such a Submittal. Contractor acknowledges and agrees that it may not rely <br /> upon receiving the City's response to a Submittal in less than 14 calendar days, unless <br /> the City explicitly changes this section by a signed Change Order. <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP—61 <br />