R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-05.3(2) Requests for Information <br /> (******) <br /> Requests for information or clarification from the Contractor to the City shall be treated <br /> as a Submittal pursuant to 1-05.3(1) SUBMITTALS. <br /> 1-05.4 Conformity With and Deviations From Plans and Stakes <br /> Delete all of 1-05.4 and substitute the following: <br /> The Contractor shall be responsible for setting and maintaining all alignment stakes, <br /> slope stakes, and grades necessary for the construction of the roadbed, surfacing, <br /> paving, channelization, illumination, signing, bridges, and retaining walls, if such <br /> construction is included in this Project. Except for the survey control data to be furnished <br /> by the City, calculations, surveying, and measuring required for setting and maintaining <br /> the necessary lines and grades shall be the Contractor's responsibility. The Contractor <br /> shall provide the City with copies of such calculations and staking data when requested <br /> by the Engineer. Copies of the City provided survey control data are available for the <br /> Bidder's inspection at the office of the Project Engineer. <br /> Any staking requirements for the Project that do not fit field conditions will be reviewed <br /> and if necessary adjusted by the Engineer. Any necessary revisions to the staking <br /> information will be provided to the Contractor for use in completing the Work. <br /> Stakes, marks, and other reference points, including existing monumentation, set by the <br /> City shall be carefully preserved by the Contractor. The Contractor will be charged for <br /> the costs of replacing stakes, markers and monumentation that were not to be disturbed <br /> but were destroyed or damaged by the Contractor's operations. This charge will be <br /> deducted from monies due or to become due to the Contractor. <br /> To facilitate the establishment of these lines and elevations, the City will provide the <br /> Contractor with the following survey control: <br /> ROADWAY, SURFACING AND PAVING <br /> Establish elevation benchmarks and center or base line alignment control <br /> points for the mainline, one time only. Provide right of way stakes where <br /> applicable. <br /> Provide rights-of-way, easements or right-of-entry. <br /> Provide the Contractor with technical advice if requested. <br /> Computed grades where needed. <br /> Provide horizontal and vertical curve data. <br /> One copy of transit notes showing reference to horizontal and vertical control <br /> points. <br /> OTHER STRUCTURES <br /> Centerline or offset coordinates to centerline of the structure. <br /> A sufficient number of benchmarks for levels to enable the Contractor to set <br /> grades at reasonably short distances. <br /> Monuments and control points as shown on the Plans. <br /> The Contractor shall give the City three weeks notification to allow adequate <br /> time to provide the above data. <br /> The Contractor shall ensure a surveying accuracy within the following tolerances: <br /> 1. Slope stakes ±0.1 foot <br /> 2. Subgrade blue tops ±0.01 foot <br /> 3. Stationing ±0.01 foot <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-62 <br />