My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-05.18(2) Construction Procedures <br /> The Contractor shall supervise and direct the Work and determine the means, methods, <br /> techniques, sequences and procedures of construction, except in those instances where <br /> the City, to define the quality of an item of Work, specifies in the Contract a means, <br /> method, technique, sequence or procedure for construction of that item of Work. The <br /> Contractor shall execute Work in conformity with the standard practice of the trade. <br /> 1-05.18(3) Responsibilities <br /> 1-05.18(3)A Manufacturers and Suppliers <br /> The Contractor shall be responsible for the adequacy, efficiency and sufficiency of <br /> manufacturers, Suppliers and their employees. <br /> 1-05.18(3)B Contractor's Employees <br /> The Contractor shall be responsible for the adequacy, efficiency and sufficiency of <br /> its employees. Workers shall have sufficient knowledge, skill and experience to <br /> perform properly the Work assigned to them. <br /> 1-05.18(3)C Payment for Labor and Materials <br /> The Contractor shall pay and require its Subcontractors to pay any and all accounts <br /> for labor including Worker's Compensation premiums, State Unemployment and <br /> Federal Social Security payments and other wage and salary deductions required <br /> by law. The Contractor also shall pay and cause its Subcontractors to pay any and <br /> all accounts for services, equipment, and materials used by him and its <br /> Subcontractors during the performance of Work under this Contract. The <br /> Contractor shall pay such accounts as they become due and payable. If requested <br /> by the City, the Contractor shall promptly furnish proof of payment of such accounts <br /> to the City. <br /> 1-05.18(3)D Attention to Work <br /> The Contractor, either in person or acting through its representative, shall give <br /> personal attention to and shall manage the Work so that it shall be prosecuted <br /> faithfully and completed under the Project schedule. When its representative is not <br /> personally present at the Project site, its designated alternate shall be available and <br /> shall have the authority to act in matters relating to this Contract. <br /> Where detailed construction requirements are not set forth in the Standard <br /> Specifications or these Special Provisions, the Contractor shall perform the Work of <br /> a quality comparable to the workmanship specified for other parts of the Work, from <br /> firms having established good reputations for similar Work, or by following industry <br /> standard practices. The Contractor shall perform all Work in compliance with and <br /> conforming to applicable building codes in effect at the time the Work is being <br /> performed. <br /> 1-05.18(3)E Safety <br /> The Contractor alone shall be responsible for safety on the job site, including, but <br /> not limited to, the safety of its and its Subcontractor's employees. The Contractor <br /> shall maintain the Project site and perform the Work in a manner that meets the <br /> City's responsibility under statutory and common law for the provision of a safe <br /> place to work. <br /> 1-05.18(3)F Threats, Intimidation and Harassment Forbidden <br /> Contractor shall not allow its employees, its Subcontractors, its Subcontractors' <br /> employees, or any other agents to threaten bodily injury or property damage, to <br /> intimidate or attempt to intimidate any person, or to assault or physically harass any <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP-70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.