Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Supplement Section 1-05 by adding the following new subsections: <br /> 1-05.16 Water and Power <br /> (******) <br /> The Contractor shall make necessary arrangements and shall bear the costs for power and <br /> water necessary for the performance of the Work, unless the Contract includes power and <br /> water as a pay item. <br /> Contractor shall pay all power and water costs until Substantial Completion, whether such <br /> power or water is provided by temporary or permanent facilities. City shall not be liable for <br /> any costs or Delays arising out of or caused by the availability or lack of availability of <br /> permanent power or utilities. <br /> 1-05.17 Oral Agreements <br /> (******) <br /> No oral agreement or conversation with any officer, agent, or employee of the City, either <br /> before or after execution of the Contract, shall affect or modify any of the terms or obligations <br /> contained in any of the documents comprising the Contract. Such oral agreement or <br /> conversation shall be considered as unofficial information and in no way binding upon the <br /> City, unless subsequently put in writing and signed by the City. <br /> 1-05.18 Contractor <br /> 1-05.18(1) Contractor's Representative <br /> The Contractor shall notify the Owner in writing of the name of the person who will act <br /> as the Contractor's representative, will have the authority to act in matter relating to this <br /> Contract, and will be delegated with authority to act as the Contractor's emergency <br /> contact. This person shall have authority to carry out the provisions of the Contract and <br /> to supply materials, Equipment, tools and labor without delay for the performance of the <br /> Work. <br /> Contractor shall employ and keep on site on a full-time basis personnel experienced in <br /> the management of construction of projects of this size and type. These shall include, <br /> but not be limited to, a project manager and superintendent. Unless the City agrees <br /> otherwise in writing, neither the Contractor's project manager nor the superintendent <br /> shall have supervisory responsibility for other projects for the Contractor while assigned <br /> to this Project. Contractor shall employ and assign such additional, full time office, <br /> support and engineering personnel to support the project manager and superintendent <br /> and allow timely completion of the Project. The project manager and superintendent <br /> shall be approved by the City, and such approval shall not be unreasonably withheld. <br /> Contractor shall submit personnel qualifications within seven (7) days of Contractor's <br /> execution of the Contract. Basis for disapproval include, but are not limited to, lack of <br /> sufficient experience managing the construction of similar type or size projects or <br /> relationships on other projects unsatisfactory to the City or, if the Project is subject to <br /> supplemental bidder responsibility criteria and such criteria contain personnel <br /> qualifications, the personnel differ from those named by Bidder in its pre-Award <br /> supplemental bidder responsibility criteria submittals. City may require removal and <br /> replacement of Contractor's supervisory staff who are disruptive or who appear to lack <br /> sufficient competence to complete the Project successfully. <br /> Jackson Park Area Stormwater Separation <br /> WO No—UP3703 Division 1 —GENERAL REQUIREMENTS September 2020 <br /> SP—69 <br />