associated with a related GIS asset and would be triggered both for corrective work(max or min threshold <br /> hit) as well as preventive maintenance cycles (every 10 runtime hours) based on settings defined <br /> in Cityworks. <br /> Phase 5,Task 19: City Responsibility: <br /> • City will schedule and provide attendance at discovery workshop for integration functional requirements& <br /> design. (8-16 hours) <br /> • Review of design documents once designed(2-4 FTE hours) <br /> Phase 5,Task 19: Timmons Group Responsibilities and Deliverables: <br /> • Develop integration per functional requirements <br /> • Develop list of assets, their SCADA tag number, and associated work activities to be triggered by interval <br /> or threshold readings. <br /> • Verify GIS data will support the integration and recommend changes if needed. <br /> • Configure work orders <br /> • Configure asset reading settings for assets <br /> • Design, build, test, and deploy application that will use Cityworks APl to import asset readings from <br /> SCADA historian into Cityworks. <br /> Phase 5,Task 19:Assumptions: <br /> • Everett is responsible for revising GIS data model and capturing asset data to support this integration. <br /> • Everett is responsible for any changes to the network and iT infrastructure(if needed)to make the <br /> SCADA historian data available to Cityworks. <br /> • This integration will be designed to trigger work activities based off measured asset <br /> reading value(pressure, runtime hours, etc.)provided from SCADA. The functionality will not include the ability <br /> to trigger work from a combination of reading value and time. <br /> • City will provide review comments within 10 business days or a mutually agreed upon timeframe <br /> • it has been indicated by Everett that triggered PM activities only need to be based on asset readings and <br /> do not need to include time. <br /> Phase 5,Task 19:Estimated Timeframe: <br /> e The development of the integration will require approximately 8-10 weeks <br /> Phase 5, Task 20: TRAKiT Integration <br /> Utilizing the methodology outlined above Timmons Group will design and develop the integration between <br /> TRAKiT and Cityworks. <br /> Phase 5,Task 20: City Responsibility: <br /> • City will schedule and provide attendance at discovery workshop for integration functional requirements& <br /> design. (8-16 hours) <br /> • Review of design documents once designed (24 FTE hours) <br /> Phase 5,Task 20: Timmons Group Responsibilities and Deliverables: <br /> • Develop integration per functional requirements <br /> • Develop Cityworks SOPs for integration workflows <br /> Phase 5,Task 20:Assumptions: <br /> • City will provide review comments within 10 business days or a mutually agreed upon timeframe <br /> Phase 5,Task 20: Estimated Timeframe: <br /> e The development of the integration will require approximately 3-5 weeks <br /> Phase 5 Exit Criteria <br /> • Functional Requirements workshop meeting minutes <br /> • Integration Review meeting minutes <br /> • Integration functionality, code, etc. required for integration migrated from the City provided off-site <br /> Azure development environment <br /> • GraniteNet integration: <br /> • Testing <br /> • Knowledge transfer <br /> 9 Migrated existing CCTV data <br /> • Cayenta integration: <br /> 281Page <br />