Laserfiche WebLink
• <br /> . — <br /> LAND TYPE DESIGNATIONS AREA (ACRES) %OF TOTAL AREA <br /> Total Site Area 0.76 100 <br /> • Existing Pervious Surface 0.32 42 <br /> • Existing Impervious Surface 0.44 58 <br /> • Basin 1 0.76 100 <br /> • Proposed Landscape Surface 0 0 <br /> 1111 <br /> . Proposed Impervious Surface 0.76 100 <br /> Table 1:On-site Land Type Designations Summary Section <br /> 1111 <br /> . Summary of Compliance On-Site <br /> 1111 The stormwater design complies with all 9 minimum requirements as follows: <br /> Minimum Requirement#1—Stormwater Site Plan Preparation—The Stormwater Site Plan has been completed in <br /> accordance with Chapter 3 of the 2010 City of Everett Stormwater Management Manual. <br /> • Minimum Requirement#2—Construction Stormwater Pollution Prevention—A pollution prevention plan has been <br /> 41111 included in Appendix 9 which describes the 13 required elements. Further, an erosion control plan has been <br /> • prepared and is part of the engineering plan set. <br /> Minimum Requirement#3—Source Control of Pollution—See Section 5 for the Source Control Plan. <br /> 4111 <br /> Minimum Requirement#4—Preservation of Natural Drainage Systems and Outfalls—The stormwater from the <br /> project site sheet flows across the grass to the east where it flows onto Broadway Ave. and enters the city <br /> . stormwater system.The proposed project will contain all the water in a vault and release the water into the <br /> 4111 existing city combined sewer and stormwater system at the manhole in the intersection of 32"d St. and Broadway <br /> Ave. <br /> 4111 <br /> Minimum Requirement#5—On-site Stormwater Management—Stormwater runoff on-site will be collected on the <br /> roof and piped to a detention vault. During construction, stormwater will be routed to a sediment pond on-site. <br /> • See Section 3 of this report for more information. <br /> Minimum Requirement#6—Runoff Treatment—Runoff treatment is not required for roof runoff because it is not a <br /> pollution generating impervious surface.The entire site is roof runoff.See Section 8 of this report for more <br /> • information. <br /> Minimum Requirement#7—Flow Control—Runoff from the roof will be collected via downspouts are routed to a <br /> detention vault that will contain a flow control structure.See Section 8 of this report for more information. <br /> Minimum Requirement#8—Wetlands Protection—Review of the City of Everett GIS data did not indicate any <br /> - wetlands presently. <br /> 4111 Minimum Requirement#9—Operation and Maintenance—A Stormwater Facility Maintenance Program is included <br /> • in Appendix 7. <br /> 4111 <br /> 4111 <br /> 4111 <br /> . Broadway Apartments 5 of 9 Stormwater Site Plan <br />