My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3214 BROADWAY BROADWAY KINECT APARTMENTS 2021-08-11
>
Address Records
>
BROADWAY
>
3214
>
BROADWAY KINECT APARTMENTS
>
3214 BROADWAY BROADWAY KINECT APARTMENTS 2021-08-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 2:35:27 PM
Creation date
12/18/2020 2:52:33 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3214
Tenant Name
BROADWAY KINECT APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> . — <br /> LAND TYPE DESIGNATIONS AREA (ACRES) %OF TOTAL AREA <br /> Total Site Area 0.76 100 <br /> • Existing Pervious Surface 0.32 42 <br /> • Existing Impervious Surface 0.44 58 <br /> • Basin 1 0.76 100 <br /> • Proposed Landscape Surface 0 0 <br /> 1111 <br /> . Proposed Impervious Surface 0.76 100 <br /> Table 1:On-site Land Type Designations Summary Section <br /> 1111 <br /> . Summary of Compliance On-Site <br /> 1111 The stormwater design complies with all 9 minimum requirements as follows: <br /> Minimum Requirement#1—Stormwater Site Plan Preparation—The Stormwater Site Plan has been completed in <br /> accordance with Chapter 3 of the 2010 City of Everett Stormwater Management Manual. <br /> • Minimum Requirement#2—Construction Stormwater Pollution Prevention—A pollution prevention plan has been <br /> 41111 included in Appendix 9 which describes the 13 required elements. Further, an erosion control plan has been <br /> • prepared and is part of the engineering plan set. <br /> Minimum Requirement#3—Source Control of Pollution—See Section 5 for the Source Control Plan. <br /> 4111 <br /> Minimum Requirement#4—Preservation of Natural Drainage Systems and Outfalls—The stormwater from the <br /> project site sheet flows across the grass to the east where it flows onto Broadway Ave. and enters the city <br /> . stormwater system.The proposed project will contain all the water in a vault and release the water into the <br /> 4111 existing city combined sewer and stormwater system at the manhole in the intersection of 32"d St. and Broadway <br /> Ave. <br /> 4111 <br /> Minimum Requirement#5—On-site Stormwater Management—Stormwater runoff on-site will be collected on the <br /> roof and piped to a detention vault. During construction, stormwater will be routed to a sediment pond on-site. <br /> • See Section 3 of this report for more information. <br /> Minimum Requirement#6—Runoff Treatment—Runoff treatment is not required for roof runoff because it is not a <br /> pollution generating impervious surface.The entire site is roof runoff.See Section 8 of this report for more <br /> • information. <br /> Minimum Requirement#7—Flow Control—Runoff from the roof will be collected via downspouts are routed to a <br /> detention vault that will contain a flow control structure.See Section 8 of this report for more information. <br /> Minimum Requirement#8—Wetlands Protection—Review of the City of Everett GIS data did not indicate any <br /> - wetlands presently. <br /> 4111 Minimum Requirement#9—Operation and Maintenance—A Stormwater Facility Maintenance Program is included <br /> • in Appendix 7. <br /> 4111 <br /> 4111 <br /> 4111 <br /> . Broadway Apartments 5 of 9 Stormwater Site Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.