My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3214 BROADWAY BROADWAY KINECT APARTMENTS 2021-08-11
>
Address Records
>
BROADWAY
>
3214
>
BROADWAY KINECT APARTMENTS
>
3214 BROADWAY BROADWAY KINECT APARTMENTS 2021-08-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 2:35:27 PM
Creation date
12/18/2020 2:52:33 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3214
Tenant Name
BROADWAY KINECT APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• American Property Development ES-0599.06 <br /> January 22, 2015 Page 7 <br /> • Updated June 9, 2016 <br /> • <br /> • <br /> • In our opinion, where shoring is necessary, the use of a conventional cantilever or tieback <br /> • shoring system is feasible for temporary support of excavations. In our opinion, soil nailing is <br /> • also a feasible alternative for excavation shoring. For purposes of this study, we have provided <br /> recommendations for soil nailing, and recommendations for cantilever and tieback shoring. It is <br /> • important to note that if tiebacks or soil nails are utilized, appropriate easements will be required <br /> • from adjacent property owners to accommodate the tendons and nails, as appropriate. <br /> • Soil Nail Wall Recommendations <br /> • <br /> • Based on the soil conditions encountered during our fieldwork, the soil conditions are generally <br /> • favorable for soil nail walls. For design purposes, the following design parameters can be <br /> • considered for temporary soil nail walls: <br /> • • Internal Angle of Friction 38 degrees <br /> • <br /> • • Cohesion 250 psf <br /> • • Allowable Pullout 4.0 kips per foot <br /> • <br /> • • Soil Moist Unit Weight 125 pcf <br /> • • Maximum Nail Spacing 6 feet (horizontal /vertical) <br /> • <br /> • The above design parameters are intended for preliminary analysis of a soil nail wall design. <br /> • Modification of these values by the geotechnical engineer may be appropriate during the design <br /> • process, based on the results of the analyses. With respect to soil nail shotcrete facing, <br /> • temporary or permanent (foundation wall) facing can be considered as part of the top-down <br /> construction. The soil nail wall designer will need to consider shotcrete thickness and <br /> ! reinforcement requirements, as appropriate for temporary or permanent facings. <br /> = Cantilever and Single Tieback Soldier Piles <br /> • Temporary shoring should be designed to resist lateral soil pressure based on an active.earth <br /> • pressure condition. Surcharge loading from adjacent roadways or buildings should be included <br /> • in the shoring design, as appropriate. For design, the following earth pressure and surcharge <br /> • values should be used: <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • Earth Solutions NW,LLC <br /> • <br /> S. <br />
The URL can be used to link to this page
Your browser does not support the video tag.