• <br /> • <br /> • <br /> • <br /> • BMP C103: High-Visibility Plastic or Metal Fence with Backup Support • <br /> ELEMENT#2—ESTABLISH CONSTRUCTION ACCESS • <br /> A stabilized construction entrance shall be constructed to minimize the tracking of sediment onto any <br /> public road.The stabilized construction entrance shall be constructed per the TESC plans and details and • <br /> in accordance with the requirements of BMP C105. - <br /> • BMP C105: Stabilized Construction Entrance = <br /> ELEMENT#3—CONTROL FLOW RATES - <br /> The sediment trap shall be protected from siltation throughout the construction process.The off-site • <br /> flows will not be significantly impacted throughout construction, however the adjacent properties and • <br /> waterways downstream of the project shall be protected from erosion and associated discharge. - <br /> • BMP C240: Sediment Trap i <br /> • <br /> ELEMENT#4—INSTALL SEDIMENT CONTROLS • <br /> Prior to leaving a construction site, stormwater runoff must pass through a silt fence or some other • <br /> appropriate BMP for removal of sediments. Silt fence barriers shall be constructed as shown on the - <br /> temporary and erosion sediment control plans.The following BMPs are applicable for this project. If the • <br /> following BMPs are not shown on the construction plan set,the Engineer reserves the right to direct the • <br /> Contractor to install, construct, and/or implement said BMPs. <br /> • <br /> • BMP C231: Brush Barrier - <br /> • BMP C233: Silt Fence <br /> • BMP C235: Straw Wattles <br /> • <br /> ELEMENT#5—STABILIZE SOILS - <br /> All exposed and unworked soils shall be stabilized by application of effective BMPs, which protect the • <br /> soil from the erosive forces of raindrop impact, flowing water, and from wind erosion. From October 01 • <br /> through April 30 of each calendar year, no soils shall remain exposed and unworked form more than two • <br /> (2) days. From May 01 to September 30 of each calendar year, no soils shall remain exposed and • <br /> unworked for more than seven (7) days.This condition applies to all on-site soils,whether at final grade <br /> or not. • <br /> In areas where the on-site soils will remain unworked for more than the aforementioned time duration - <br /> limits or have reached final grade, seeding and mulching shall be installed in accordance with BMP C120 - <br /> and C121. Sod shall be installed in accordance with BMP C124 for disturbed areas that require <br /> immediate vegetative cover. Dust control shall be used as needed to prevent wind transport of dust • <br /> from disturbed soil surfaces and in accordance with BMP C140. If the following BMPs are not shown on - <br /> the construction plan set,the Engineer reserves the right to direct the Contractor to install, construct, • <br /> and/or implement said BMPs. <br /> • <br /> Broadway Apartments 4 of 9 Construction SWPPP - <br /> • <br /> • <br />