Laserfiche WebLink
• <br /> • <br /> • <br /> • -ems <br /> "Egb-' <br /> • <br /> • the construction plan set,the Engineer reserves the right to direct the Contractor to install, construct, <br /> and/or implement said BMPs. <br /> • <br /> • • BMP C120:Temporary and Permanent Seeding <br /> • • BMP C121: Mulching <br /> • BMP C123: Plastic Covering <br /> • • BMP C124: Sodding <br /> • • BMP C125:Topsoiling <br /> • • BMP C140: Dust Control <br /> ELEMENT#6—PROTECTING SLOPES <br /> • <br /> • Slopes shall be constructed in such a manner that will minimize erosion.This shall include, but is not <br /> • limited to: placing excavated material on the uphill side of trenches, collecting drainage at the top of <br /> slopes,etc. If the following BMPs are not shown on the construction plan set,the Engineer reserves the <br /> • right to direct the Contractor to install, construct, and/or implement said BMPs. <br /> • <br /> • • BMP C130: Surface Roughening <br /> • BMP C205: Subsurface Drains <br /> • • BMP C204: Pipe Slope Drains <br /> • • BMP C206: Level Spreader <br /> • • BMP C207: Check Dams <br /> • ELEMENT#7—PROTECT DRAIN INLETS <br /> • <br /> • All storm drain catch basins/inlets that are in use during construction, as well as all existing structures <br /> • within the project limits, shall be protected so that stormwater runoff shall not enter any conveyance <br /> system without first being filtered or treated to remove sediment from sediment laden runoff. Install <br /> • temporary catch basin filters as shown on the erosion and sediment control plans and in accordance <br /> • with BMP C220. <br /> • • BMP C220: Storm Drain Inlet Protection <br /> • <br /> • ELEMENT#8—STABILIZE CHANNELS AND OUTLETS <br /> All temporary on-site conveyance channels shall be constructed and stabilized to prevent erosion. <br /> • Stabilization, including armoring material,adequate to prevent erosion of outlets, adjacent stream <br /> • banks, slopes, and downstream reaches shall be provided at the outlets of all conveyance systems. If the <br /> • following BMPs are not shown on the construction plan set,the Engineer reserves the right to direct the <br /> Contractor to install, construct, and/or implement said BMPs. <br /> • <br /> • • BMP C202: Channel Lining <br /> • • BMP C209: Outlet Protection <br /> • <br /> • <br /> • <br /> • Broadway Apartments 5 of 9 Construction SWPPP <br /> • <br /> • <br />