Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> PROJECT DESCRIPTION • <br /> LOCATION • <br /> • <br /> The site address for Broadway Apartments project is 3214 Broadway Ave. Everett, WA 98201 • <br /> PROJECT OVERVIEW • <br /> • <br /> The proposed project will include one apartment building with one hundred forty(140) units.The • <br /> building will cover the entire project area. <br /> • <br /> EXISTING SITE CONDITIONS • <br /> • <br /> EXISTING DRAINAGE SYSTEM • <br /> Existing stormwater sheet flows across the site in the east direction and onto Broadway Ave.where it • <br /> flows into the city stormwater system. • <br /> EXISTING TOPOGRAPHY AND VEGETATION • <br /> • <br /> The project site consists of 6 parcels.The parcels were recently cleared within the past couple years. • <br /> Prior to clearing, the north portion of the site was an asphalt parking lot,there were gravel areas south • <br /> of the parking area.The project site also contained a house, a garage, and other miscellaneous small <br /> buildings with associated parking. • <br /> • <br /> ADJACENT AREAS • <br /> • <br /> To the north of the site, across 32nd Street is an apartment building. To the west of the site across the <br /> alley are residences and a church. To the south of the site is a couple of businesses, and further to the <br /> south, another apartment building. To the East of the site across Broadway Ave are offices. • <br /> • <br /> CRITICAL AREAS • <br /> No critical areas have been identified within the project area. • <br /> • <br /> SOILS • <br /> The geotechnical report from Earth Solutions NW, LLC is included in the Stormwater Site Plan in = <br /> Appendix 5. <br /> • <br /> EROSION PROBLEM AREAS • <br /> Potential on-site erosion control problems are not anticipated at this time.The Certified Professional in = <br /> Erosion and Sediment Control will be on-site or on-call during construction activities to identify any <br /> erosion control problems. If there is a problem, the Certified Professional in Erosion and Sediment • <br /> Control will promptly authorize the Contractor to initiate corrective measures. • <br /> Broadway Apartments 8of9 Construction SWPPP • <br /> • <br /> • <br />