Laserfiche WebLink
• <br /> • <br /> • <br /> • <br /> • <br /> • CONSTRUCTION PHASING <br /> • <br /> • The Broadway apartments will be constructed in one phase. <br /> • CONSTRUCTION SCHEDULE <br /> Anticipated construction activities and sequences are not known at this time. <br /> 1111 <br /> • FINANCIAL/ OWNERSHIP RESPONSIBILITIES <br /> • <br /> The Owner of the property American Property Development, Inc. is financing the <br /> construction/installation of the site improvements. <br /> • <br /> • ENGINEERING CALCULATIONS <br /> • MGS Flood was used for calculations to size the detention vault facility. <br /> • SITE PLAN <br /> • <br /> • Temporary TESC plans are included in the Drainage Plans. <br /> • REFERENCES <br /> • <br /> • Chapter 2 of Volume 11 of the City of Everett Stormwater Management Manual <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • Broadway Apartments 9 of 9 Construction SWPPP <br /> • <br /> 41111 <br />