Laserfiche WebLink
• <br /> • <br /> CITY OF EVERETT STORMWATER MANAGEMENT MANUAL • <br /> • <br /> 2. Upgrade the road surface strength by improving particle size, shape, and mineral types that make • <br /> up the surface and base materials. <br /> 3. Add surface gravel to reduce the source of dust emission. Limit the amount of fine particles • <br /> (those smaller than .075 mm)to 10 to 20 percent. • <br /> 4. Use geotextile fabrics to increase the strength of new roads or roads undergoing reconstruction. • <br /> 5. Encourage the use of alternate,paved routes, if available. • <br /> 6. Restrict use by tracked vehicles and heavy trucks to prevent damage to road surface and base. • <br /> 7. Apply chemical dust suppressants using the admix method, blending the product with the top few • <br /> inches of surface material. Suppressants may also be applied as surface treatments. • <br /> 8. Pave unpaved permanent roads and other trafficked areas. '• <br /> 9. Use vacuum street sweepers. • <br /> 10. Remove mud and other dirt promptly so it does not dry and then turn into dust. • <br /> 11. Limit dust-causing work on windy days. • <br /> Contact the Puget Sound Air Pollution Control Agency(PSAPCA) for guidance and training on other • <br /> dust control measures. Compliance with PSACP constitutes compliance with this BMP. • <br /> Maintenance Standards • <br /> Re-spray area as necessary to keep dust to a minimum. • <br /> 3.2.17 BMP C150: Materials on Hand • <br /> • <br /> Purpose • <br /> Quantities of erosion prevention and sediment control materials shall be kept on the project site at all • <br /> times to be used for emergency situations such as unexpected heavy summer rains. Having these <br /> materials on site reduces the time needed to implement BMPs when inspections indicate that existing • <br /> BMPs are not meeting the C-SWPPP requirements. • <br /> Conditions of Use • <br /> 1. Materials shall be stockpiled and readily available before any site clearing, grubbing,or • <br /> earthwork begins. • <br /> 2. If storage space at the project site is at a premium,the contractor shall maintain the materials at • <br /> their office or yard. The office or yard must be less than an hour from the project site. <br /> Design and Installation Specifications • <br /> • <br /> Depending on the project type, size, complexity,and length, materials and quantities will vary. A good <br /> minimum that will cover numerous situations includes the materials in the table at the end of this section. <br /> • <br /> Maintenance Standards • <br /> 1. All materials with the exception of the quarry spalls, steel T-posts, and gravel should be kept • <br /> covered and out of both sun and rain. <br /> 2. Materials shall be restocked as needed. • <br /> • <br /> • <br /> • <br /> • <br /> Volume II—Construction Stormwater Pollution Prevention • <br /> 3-29 <br /> • <br /> • <br />