Laserfiche WebLink
• <br /> • <br /> • CITY OF EVERETT STORMWATER MANAGEMENT MANUAL <br /> • <br /> • Material Measure Quantity <br /> • Clear Plastic, 6 mil 100 foot roll 1-2 <br /> • Drainpipe, 6 or 8 inch diameter 25 foot section 4-6 <br /> • Sandbags,filled each 25-50 <br /> • Straw Bales for mulching approx. 50#each 10-20 <br /> Quarry Spalls ton 2-4• <br /> Washed Gravel cubic yard 2-4 <br /> • Geotextile Fabric 100 foot roll 1-2 <br /> • Catch Basin Inserts each 2-4 <br /> • Steel T-Posts each 12-24 <br /> - 3.2.18 BMP C151: Concrete Handling <br /> • Purpose <br /> • Concrete work can generate process water and slurry that contain fine particles and high pH, both of <br /> • which can violate water quality standards in the receiving water. This BMP is intended to minimize and <br /> eliminate concrete process water and slurry from entering waters of the state. <br /> • Conditions of Use <br /> • For use any time concrete is used,these management practices shall be utilized. Concrete construction <br /> • projects include, but are not limited to,the following: <br /> • 1. Curbs <br /> • 2. Sidewalks <br /> • 3. Roads <br /> • 4. Bridges <br /> • 5. Foundations <br /> • 6. Floors <br /> • 7. Runways. <br /> • Design and Installation Specifications <br /> 1. Concrete truck chutes, pumps,and internals shall be washed out only into formed areas awaiting <br /> ID installation of concrete or asphalt. <br /> • 2. Unused concrete remaining in the truck and pump shall be returned to the originating batch plant <br /> • for recycling, as feasible. <br /> I• 3. Hand tools including, but not limited to, screeds, shovels,rakes, floats, and trowels shall be <br /> • washed off only into formed areas awaiting installation of concrete or asphalt. <br /> • 4. Equipment that cannot be easily moved, such as concrete pavers, shall only be washed in areas <br /> • that do not directly drain to natural or constructed stormwater conveyances. <br /> • 5. Wash down from areas such as concrete aggregate driveways shall not drain directly to natural or <br /> constructed stormwater conveyances. <br /> • <br /> • <br /> • <br /> Volume II— Construction Stormwater Pollution Prevention <br /> 3-30 <br /> • <br /> • <br />