My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3214 BROADWAY BROADWAY KINECT APARTMENTS 2021-08-11
>
Address Records
>
BROADWAY
>
3214
>
BROADWAY KINECT APARTMENTS
>
3214 BROADWAY BROADWAY KINECT APARTMENTS 2021-08-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 2:35:27 PM
Creation date
12/18/2020 2:52:33 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3214
Tenant Name
BROADWAY KINECT APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> CITY OF EVERETT STORMWATER MANAGEMENT MANUAL <br /> • Ecology will maintain a list of ESC training and certification providers at: <br /> <www.ecy.wa.gov/programs/wq/stormwater>. <br /> Certification shall remain valid for 3 years. <br /> r <br /> Specifications <br /> • 1. The CESCL shall have authority to act on behalf of the contractor or developer and shall be <br /> available, on call,24 hours per day throughout the period of construction. <br /> 111 <br /> fib <br /> 2. The C-SWPPP shall include the name,telephone number,fax number,and address of the <br /> designated CESCL. <br /> 3. A CESCL may provide inspection and compliance services for multiple construction projects in <br /> • the same geographic region. <br /> Duties and responsibilities of the CESCL shall include,but are not limited to the following: <br /> 4111 1. Maintaining permit file on site at all times which includes the C-SWPPP and any associated <br /> • permits and plans. <br /> • 2. Directing BMP installation, inspection,maintenance,modification, and removal. <br /> • 3. Updating all project drawings and the C-SWPPP with changes made. <br /> • 4. Keeping daily records and inspection reports. Inspection reports should include: <br /> • a. Inspection date/time. <br /> b. Weather information; general conditions during inspection and approximate amount of <br /> • precipitation since the last inspection. <br /> • c. Locations of BMPs inspected <br /> • d. Locations of BMPs that need maintenance <br /> • e. Locations of BMPs that failed to operate as designed or intended, and <br /> • f. Locations of where additional or different BMPs are required. <br /> • g. Visual monitoring results, including a description of discharged stormwater. The <br /> • presence of suspended sediment, turbid water, discoloration, and oil sheen shall be <br /> • noted,as applicable. <br /> . h. Any water quality monitoring performed during inspection. <br /> • i. General comments and notes, including a brief description of any BMP repairs, <br /> maintenance or installations made as a result of the inspection. <br /> • 5. Facilitating, participating in,and taking corrective actions resulting from inspections performed <br /> • by outside agencies or the owner. <br /> 3.2.22 BMP C161: Payment of Erosion Control Work <br /> • Purpose <br /> • As with any construction operation,the contractor should be paid for erosion control work. Payment for <br /> erosion control must be addressed during project development and design. Method of payment should be <br /> identified in the C-SWPPP. <br /> ID <br /> 4111 <br /> • Volume I1— Construction Stormwater Pollution Prevention <br /> 3-34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.