Laserfiche WebLink
• <br /> CITY OF EVERETT STORMWATER MANAGEMENT MANUAL <br /> • Ecology will maintain a list of ESC training and certification providers at: <br /> <www.ecy.wa.gov/programs/wq/stormwater>. <br /> Certification shall remain valid for 3 years. <br /> r <br /> Specifications <br /> • 1. The CESCL shall have authority to act on behalf of the contractor or developer and shall be <br /> available, on call,24 hours per day throughout the period of construction. <br /> 111 <br /> fib <br /> 2. The C-SWPPP shall include the name,telephone number,fax number,and address of the <br /> designated CESCL. <br /> 3. A CESCL may provide inspection and compliance services for multiple construction projects in <br /> • the same geographic region. <br /> Duties and responsibilities of the CESCL shall include,but are not limited to the following: <br /> 4111 1. Maintaining permit file on site at all times which includes the C-SWPPP and any associated <br /> • permits and plans. <br /> • 2. Directing BMP installation, inspection,maintenance,modification, and removal. <br /> • 3. Updating all project drawings and the C-SWPPP with changes made. <br /> • 4. Keeping daily records and inspection reports. Inspection reports should include: <br /> • a. Inspection date/time. <br /> b. Weather information; general conditions during inspection and approximate amount of <br /> • precipitation since the last inspection. <br /> • c. Locations of BMPs inspected <br /> • d. Locations of BMPs that need maintenance <br /> • e. Locations of BMPs that failed to operate as designed or intended, and <br /> • f. Locations of where additional or different BMPs are required. <br /> • g. Visual monitoring results, including a description of discharged stormwater. The <br /> • presence of suspended sediment, turbid water, discoloration, and oil sheen shall be <br /> • noted,as applicable. <br /> . h. Any water quality monitoring performed during inspection. <br /> • i. General comments and notes, including a brief description of any BMP repairs, <br /> maintenance or installations made as a result of the inspection. <br /> • 5. Facilitating, participating in,and taking corrective actions resulting from inspections performed <br /> • by outside agencies or the owner. <br /> 3.2.22 BMP C161: Payment of Erosion Control Work <br /> • Purpose <br /> • As with any construction operation,the contractor should be paid for erosion control work. Payment for <br /> erosion control must be addressed during project development and design. Method of payment should be <br /> identified in the C-SWPPP. <br /> ID <br /> 4111 <br /> • Volume I1— Construction Stormwater Pollution Prevention <br /> 3-34 <br />