Laserfiche WebLink
32 Everett Apartment REVISION#5 <br /> Project: 32 Everett Apartment <br /> Addenda date: 2/21/2019 <br /> From the office of: American Property Development, Inc. <br /> 110— l 10u Ave NE, Suite 550 <br /> Bellevue, WA 98004 <br /> NOTICE TO ALL CONTRACTORS, SUBCONTRACTORS AND SUPPLIERS <br /> This revision#5 modifies the original Issue for Construction. The drawings have been <br /> "clouded"and had a Delta#5. This revision is issued to clarify,revise, add or delete <br /> from the original Issue for Construction. <br /> Sheet# Description Reason for Change <br /> E0.01 1. Interior Luminaire Schedule has been updated. Per revised arch. <br /> E1.01 — 1. Lighting layout in I stfloor public areas has been Per revised arch. <br /> E1.01A updated per latest RCP. <br /> a. Light fixture DP1 have been added in Coffee Café, <br /> Living Rm, and Lobby. <br /> b. Light fixture T2 have been added in Lobby. <br /> c. Location and quantity of light fixture Cl have been <br /> updated. <br /> d. Lighting in Back of House areas has been circuited <br /> to a new circuit separated from <br /> Lobby. <br /> e. Lighting layout in Back of House areas has been <br /> updated. <br /> E1.02A 1. Revised lighting for Vault and electrical switch gear Per revised arch. <br /> room. <br /> 2. Revised lighting for ELEC METER RM. <br /> E1.03A 1. Add exit sign at north deck access. Per revised arch. <br /> E2.02 1. Revised wireways for MR3, MR4. Per revised arch. <br /> 2. Revised wireways for MR1. <br /> E2.02A 1. Relocated MB1 Per revised arch. <br /> 2. Relocated MB2 <br /> 3. Revised Electrical room <br /> 4. Added new fans VTEF-1 and VTSF-1 <br /> E2.03 Revised floor penetrations per new layout. Per revised arch. <br /> E2.08 Added roof block out for conduits. Per revised arch. <br /> E2.08A added roof block out for conduits Per revised arch. <br /> E3.01 1. Relocated Electrical Room Per revised arch. <br /> 2. Added receptacles to new lobby. <br /> 3. Relocated equipment in fire room to new fire room <br /> location <br /> 4. Added equipment to boiler room <br /> 3/4/2019 page 1 of 3 J <br /> 8:20:19 AM �� <br />