Laserfiche WebLink
5. GYM removed floor boxes and added wall outlets <br /> for equipment. <br /> 6. Added flaq notes three and four. <br /> E3.06 added new drawing for Electrical Vault. Per revised arch. <br /> E4.00 1. Units Luminaire Schedule has been added. Per revised arch. <br /> E4.01 1. Location of receptacles in unit 861 &888 has been Per revised arch. <br /> updated per latest unit plans. <br /> E4.02 1. Flag note#3 has been added. Per revised arch. <br /> 2. Connection for Microwave and Hood has been <br /> separated into two connections. <br /> 3. Connection and switch for Range Hood have been <br /> added in ADA unit 474, 643, & 870. <br /> E5.00 Revised one-line diagram. Per revised arch. <br /> E5.00A Revised feeder schedule. Per revised arch. <br /> E5.01 1. Panel HP-LR Schedule has been updated. Per revised arch. <br /> E5.02 1. Panel 1 HNa Schedule has been updated. Per revised arch. <br /> E5.03 1. Panel HPL schedule has been updated. Per revised arch. <br /> M002 1. Updated VTSF-1, VTEF-1, EF-20, EF-27, note 6 Per revised arch. <br /> schedule <br /> 2. Added note 18 <br /> M201 1. Updated lobby area, gym, and electrical room Per revised arch. <br /> M202 1. Update transformer room Per revised arch. <br /> M203 1. Update corridor supply Per revised arch. <br /> M204 1. Update corridor supply Per revised arch. <br /> M205 1. Update corridor supply Per revised arch. <br /> M206 1. Update corridor supply Per revised arch. <br /> M207 1. Update corridor supply Per revised arch. <br /> M208 1. Update supply ductwork Per revised arch. <br /> M300 1. Update exhaust ductwork and flag notes Per revised arch. <br /> M301 1. Update exhaust ductwork and flag notes Per revised arch. <br /> END OF REVISION#5 <br /> ChanHo Park 2/21/2019 <br /> Architect Date <br /> Director of Development Date <br /> 3/4/2019 Page 2 of 3 <br /> 8:20:19 AM <br />