Laserfiche WebLink
INFORMATION FOR DEVELOPER: <br /> The following information is provided for the developer's benefit. These are not SEPA conditions but are <br /> associated with other laws or requirements. All requirements are preliminary in nature, and are based upon <br /> the preliminary site plan and the ordinances in effect at time of submittal for SEPA review. The proposal <br /> must comply with all ordinances in effect at the time a complete building permit application is filed, <br /> including those not specifically set forth herein. Contact the Planning Department for information regarding <br /> appeals processes for the requirements listed in this document. <br /> Planning Department Comments—Teresa Weldon—425.257.8731 <br /> 1. This development proposal is subject to the requirements of the Everett Municipal Code,Title 19. The <br /> project must meet, among other requirements,the applicable design requirements of the BMU zone in <br /> Chapter 31A,and the General Provisions of Subsection 39.155 Supportive Housing. <br /> 2. A NEPA review will be required for this project if federal funding is proposed. For information,or to <br /> provide for comments related to the NEPA review,please contact Ross Johnson or Rebecca McCrary at <br /> 425.257.8731 or at planning@everettwa.gov. <br /> 3. "Supportive housing"means a combination of housing,including low barrier housing, and services <br /> intended as a cost-effective way to help people live more stable and productive lives. The housing type is <br /> a multiple-family dwelling owned or sponsored by a qualified nonprofit provider or government entity, <br /> designed for occupancy by persons that are either(1)experiencing or at risk of experiencing <br /> homelessness; (2) are experiencing a disability that presents barriers to employment and housing <br /> stability; or(3) generally require structured supportive services such as case management and twenty- <br /> four-hour on-site facility management to be successful living in the community; and is intended to <br /> provide long-term,rather than transitional,housing. <br /> 4. A Final Management Plan is required to be submitted with construction permit applications. <br /> 5. Provide a use covenant acceptable to the city that restricts the use of the residential units and supportive <br /> commercial areas(as defined during the permitting process)to supportive housing.The covenant will <br /> need to be recorded on title of the property prior to construction permit issuance. A draft copy of the use <br /> covenant shall be submitted at the time of construction permit submittal for City review. <br /> 6. Parking must be provided per the City Zoning Code and City Design and Construction Standards and <br /> Specifications. Supportive housing developments shall provide a minimum of 1 parking space per 4 <br /> dwelling units. A Traffic and Parking Analysis by Heffron Transportation, Inc.was submitted on July 25, <br /> 2017 and a revised Parking Matrix detailing the uses and square footages of the proposed structure was <br /> submitted on 8/29/17 by the applicant. Based on the matrix, a total of 67 parking spaces are required. 65 <br /> stalls will be provided on the lower level and.21 on the upper level. In addition,the project will be <br /> providing parking for up to 85 bicycles. <br /> 7. A landscaping plan is required to be submitted with the construction permit applications(Building Permit <br /> and Public Works Permit applications). Landscape Plans shall be prepared by Licensed Professionals. <br /> Landscape plans shall be prepared by professionals licensed or certified in Washington State,such as <br /> licensed landscape architects,architects,engineers, or certified professional horticulturists, <br /> nurserypersons,or landscape designers.Prior to issuance of any permits,landscape plans must be <br /> 3 ! a <br /> Final NEON 17-006 <br />