My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY HOPEWORKS STATION 2 2020-12-21
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
3315 BROADWAY HOPEWORKS STATION 2 2020-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 8:50:44 AM
Creation date
12/18/2020 3:42:51 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
737
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Fire Hydrants-Locations as planned are acceptable. <br /> 9. A fire hydrant shall be located within 100 feet of a fire department connection or standpipe. 2015 IFC, <br /> 507.5.1.1. <br /> 10.Fire flow for this project is 1750 gpm. <br /> 11. Portable Fire Protection-A portable fire extinguisher with a minimum U.L.rating of 2-A:10-B:C shall <br /> be provided within 75 feet of travel on all floors of each building during construction and prior to <br /> occupancy.2015 IFC, Section 906. <br /> 12. Garages-Install a portable fire extinguisher with a minimum U.L.rating of 2-A:40-B:C within 30 feet <br /> travel distance of all portions of this building. 2015 IFC,Table 906.3(2). <br /> 13. Fire AIarm System-An approved automatic fire detection system shall be provided as required by City <br /> Ordinance No. 3021-07, Chapter 16.76,of the Everett Municipal Code. <br /> Plans for such system shall be submitted to the Fire Code Official for review and approval prior to <br /> installation. Submittal shall include cut sheets of all equipment intended for use. Appropriate trip tests, <br /> witnessed by a Fire Department Inspector,shall be performed,along with a certificate of completion, <br /> prior to final acceptance of the system. <br /> Fire alarm systems shall be installed according to NFPA Chapter 72, 2013 Edition. Installation of fire <br /> alarm components,including basic wiring,may not commence before plans are approved by the <br /> Fire Department Plan Reviewer. Fire alarm drawings must be professionally rendered, in sufficient <br /> detail,and must be internally consistent. Riser diagrams must match installation plans and load <br /> calculations. Components must be listed and approved for use together. Changes to plans must include <br /> new drawings and calculations and must be approved by the Fire Department Plan Reviewer prior to <br /> installation. Fire alarm installation is subject to field inspection by a Fire Department Inspector. An <br /> approved set of plans and the Engineering&Public Services Department electrical permit must be <br /> present for any installation inspection. <br /> Fire alarm systems shall be installed under permit of the City of Everett Engineering&Public Services <br /> Department. Electrical inspections and approval are required prior to calling for acceptance tests. Call <br /> (425)257-8810 for permit information. <br /> The absence of monitoring for the alarm system will be cause for postponing Fire Department <br /> inspection and testing and shall result in denial of occupancy. <br /> A copy of NFPA 72 Record of Completion form must be filled out prior to final occupancy(NFPA 72, <br /> 2013 Edition,Chapter 7,pages 107-147). 2015 IFC, 907.7.2 <br /> Call for design requirements per Authority Having Jurisdiction. <br /> Automatic smoke detection is required. <br /> 14. For buildings with two or more floors, including sub-floors,the alarm system must call point-by-point <br /> reporting to an alarm center.Note: Fire alarm annunciator panel to be in lobby area. <br /> 7 /G <br /> Final MDN #17-006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.