Laserfiche WebLink
4 <br /> CITY OF EVERETT f�^ <br /> PLANNING DIRECTOR DECISIONy <br /> Supportive Housing and Design Review <br /> REV II#17-009 <br /> HopeWorks Station II <br /> September 13,2017 <br /> Project Description: The proposed action is to construct a building of 65 units of supportive <br /> housing, with a combination of commercial uses including office, furniture sales, restaurant, <br /> commissary kitchen and training spaces. Parking will be accessed off Broadway and below grade <br /> from the alley. A total of 86 parking spaces are proposed. A Final Mitigated Determination of Non- <br /> Significance was issued for this project under project file number SEPA17-006. <br /> Applicant: HopeWorks <br /> 3331 Broadway <br /> Everett,WA 98201 <br /> Primary Contact: Dykeman Architects,Doug Hofius <br /> 1716 West Marine View Drive <br /> Everett, WA 98201 <br /> Project Location: 3315 Broadway <br /> Everett,WA 98201 <br /> (new assigned address) <br /> Parcel(s): 00439079600500,00439079600170,00439079600900,00439079601100 <br /> Zoning: BMU,Broadway Mixed Use <br /> City Contact: Teresa Weldon, City of Everett Planner, (425)257-8731 <br /> SUPPORTIVE HOUSING EVALUATION CRITERIA <br /> Supportive Housing is a permitted use in the BMU zone through a Review Process II. The proposed <br /> supportive housing project was evaluated based on the development standards of Section 39.155, <br /> Supportive Housing of Title 19 of the Everett Municipal Code. <br /> 1. The allowed density shall be the number of units that can be placed on the site while meeting the <br /> dimensional standards and all other required standards of the zone in which the project is located <br /> except that in single family zones, building height shall be determined during the review process <br /> based upon compatibility with surrounding uses. <br /> Findings: The property is zoned BMU which has no density limitation. The proposal includes <br /> 65 supportive housing units. <br /> 2. Access to transit must be available within five hundred feet of the development. <br /> Findings: Everett Transit has routes serving the project site along Broadway,with the nearest bus <br /> stop located 250 feet south of the project, at the southeast corner of the intersection of 34th Street <br /> and Broadway. <br /> 3. A written management plan shall be r ' ed or the review and approval of the planning <br /> age I of <br /> Project II17-009 <br />