My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY HOPEWORKS STATION 2 2020-12-21
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
3315 BROADWAY HOPEWORKS STATION 2 2020-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 8:50:44 AM
Creation date
12/18/2020 3:42:51 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
737
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
director. At a minimum, a management plan shall address the following components: <br /> a. Spec fy the nature of the supportive housing project and its intended occupants; <br /> b. Identify potential impact(s) on nearby residential uses and proposed methods to mitigate <br /> those impacts; <br /> c. Include a neighborhood outreach plan that addresses how the applicant will communicate <br /> with and inform the neighborhood before and after project approval; <br /> d. Identify the project management or agency whom support staff are responsible and who will <br /> be able to resolve concerns pertaining to the facility. The plan shall specify procedures for <br /> updating any changes in contact information; <br /> e. Identify staffing, supervision and security arrangements appropriate to the facility. A <br /> twenty-four-hour on-site manager is required; <br /> f On-site services shall be for residents of the facility only; <br /> g. The management plan will contain requirements for updating all contact information to the <br /> city when changes occur; <br /> h. If the planning director determines at any time there is evidence offraud in obtaining the <br /> permit; concealment or misrepresentation of any material fact on the application or on any <br /> subsequent applications or reports; or that the supportive housing project is found to be in <br /> violation of the approved plans, conditions of approval, or the terms of the permit or <br /> management plan, and the owner has failed to correct the violation after proper notice <br /> thereof then the city may initiate compliance proceedings as provided by Chapter 1.20. <br /> Findings: A draft management plan was submitted with the application. In response to item f <br /> above, on-site services include those for the residences and will also include programs for non- <br /> residences. A social service facility use and other commercial uses are permitted in the BMU <br /> zone; therefore, this project is not strictly limited to on-site services for the residents only. Per <br /> item g, the applicant shall revise their draft management plan to provide contact information to <br /> the City once the facility is operational. <br /> 4. A use compliance inspection or report may be required periodically by the city as determined by <br /> the planning director. If a permanent supportive housing project is discontinued or abandoned, <br /> future use of the property shall be in conformance with the use and development standards of the <br /> underlying zone or overlay zone. <br /> Findings: This requirement will apply to the supportive housing facility. <br /> DESIGN REVIEW—Chapter 31A. <br /> The project generally meets the design requirements.A final review of overall project design approval <br /> will be based on construction permit application review.The design has been rated with the following: <br /> 0 Approved; <br /> ❑ Subject to approval during building permit application review; or <br /> ® Not approved/needs work <br /> Q Permitted Use. Supportive housing is a permitted use through a Review Process II and the other <br /> non-residential uses described above are permitted outright. <br /> ❑Amount of Off-Street Parking.Supportive housing requires one space for every 4 dwelling units. <br /> A traffic and parking analysis was submitted and a parking matrix was submitted showing revised <br /> uses and square footages of the proposed structure by the applicant. Based on a review of both <br /> documents, a total of 67 parking spaces are required. 65 stalls will be provided on the lower level <br /> accessed from the alley and 21 on the upper level accessed from Broadway,for a total of 86 off-street <br /> parking stalls.If square footages of the project remain the same as shown in the matrix dated 8/29/17, <br /> the project would have a surplus of 19 spaces. The number of off-street parking spaces required will <br /> <Page 2 of 4 <br /> Project#REV II17-009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.