My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY HOPEWORKS STATION 2 2020-12-21
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
3315 BROADWAY HOPEWORKS STATION 2 2020-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 8:50:44 AM
Creation date
12/18/2020 3:42:51 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
737
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t . <br /> ri <br /> ' .0'1. PUSLit WORKS <br /> PUBLIC WORKS DIRECTOR INTERIM POLICY <br /> Stormwater Control in the Combined Sewer Area <br /> IPublic Works Policy#: 2-11 Supersedes Policy# 1-11 <br /> SUBJECT: Stormwater control in the combined sewer area. <br /> The combined sewer area shall be that described in the attached map or as updated by <br /> City of Everett Public Works Utility Mapping. <br /> BACKGROUND: Heavy storm events have caused localized surcharges in the City's <br /> combined sewer system,flooding basements and streets in North Everett. This flooding <br /> has been disruptive for citizens,causing damage to homes, creating health concerns, <br /> ' and imposing a financial burden on the rate-based utility. Controlling stormwater <br /> discharges to the combined sewer system would mitigate these impacts. <br /> EMC 14.56.020 authorizes the Public Works Director to adopt rules and procedures to <br /> implement chapters 14.56, Surface Water System, and 14.28, Surface and Storm <br /> Drainage. Pursuant to that authority, this policy modifies the City's Design and <br /> Construction Standards and Specifications(Section 4: Storm and Surface Water) and <br /> the City's 2010 Stormwater Management Manual by making application of the <br /> stormwater manual mandatory in the combined sewer area. <br /> EMC 14.08.135.A.3 authorizes the Director to establish rules for the administration of <br /> the sewer connection fees established by EMC 14.08.135.A.1. EMC 14.08.135.A.4 <br /> 1 provides a basis for the exercise of the City's SEPA authority to require mitigation to <br /> supplement other code requirements. The Director in this policy exercises the authority <br /> granted by EMC 14.08.135.A.1, A.3, and A.4 to provide a credit against the sewer <br /> connection fee for the cost of stormwater controls that are in addition to those set forth <br /> in the Stormwater Management Manual. <br /> ' slecommon+clericalgim.mtstormwater interim policy(6).docz <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, WA 98201 • (425)257-8800 Fax (425)257-8882 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.