My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY HOPEWORKS STATION 2 2020-12-21
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
3315 BROADWAY HOPEWORKS STATION 2 2020-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 8:50:44 AM
Creation date
12/18/2020 3:42:51 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
737
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> . <br /> I <br /> IINTERIM POLICY: The following interim policy shall apply to all new development and <br /> redevelopment that creates and/or redevelops a total of 2,000 sq.ft. or more of <br /> impervious area: <br /> 1. Stormwater in the combined sewer area shall be controlled according to <br /> Ithe requirements in the City's 2010 Stormwater Management Manual, with <br /> the exception of Minimum Requirement#6—Runoff Treatment and in <br /> Minimum Requirement#7—Flow Control, the term "a forested land cover" <br /> shall be replaced by"the existing site conditions", provided that the <br /> resulting stormwater flow shall not increase Combined Sewer Overflows <br /> I (CSOs)and/or basement flooding in the combined sewer area. <br /> 2. The cost of stormwater controls that are required in addition to <br /> I requirements of the Stormwater Management Manual will be credited <br /> against the project's sewer connection charge(EMC 14.08.135). The <br /> amount credited shall be based on a bid amount for the additional controls <br /> Iprovided to the City by the developer. <br /> 3. No connections of roof drains to side sewers or laterals shall be allowed' <br /> without prior approval of the Director. <br /> IDURATION OF INTERIM POLICY: <br /> I This policy applies to all applications for project permits submitted after the effective <br /> date of the policy. See EMC 15.28.010. The policy shall take effect on the date the <br /> Director signs it and remain in effect until the date the Director terminates it in writing or <br /> I issues a policy expressly superseding this interim policy. The Director intends to review <br /> this interim policy upon the update of the Comprehensive Sewer Plan in approximately <br /> one yearand to revise the policy if warranted by the updated plan. <br /> I <br /> Signed: <br /> 0---- Date: I 1/4/174 <br /> David H. Davis, P.E., Public Works Director <br /> I <br /> Is:Wcommon}clericaryim.m\stormwatet interim policy(6).docx <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.