Hope Works Social Enterprises JN 17298 <br /> July 12, 2017 Page 14 <br /> temporary cuts. Cut slopes should be planned to intersect the backside of the drilled <br /> holes, not the back of the lagging. <br /> Lateral movement of the soldier piles below the excavation level will be resisted by <br /> an ultimate passive soil pressure equal to that pressure exerted by a fluid with a <br /> density of 525 pcf. This soil pressure is valid only for a level excavation in front of the <br /> soldier pile; it acts on two times the grouted pile diameter. Cut slopes made in front <br /> of shoring walls significantly decrease the passive resistance. This includes <br /> temporary cuts necessary to install internal braces or rakers. The minimum <br /> embedment below the floor of the excavation for cantilever soldier piles should be <br /> equal to the height of the "stick-up." A typical temporary shoring detail is attached to <br /> this report as Plate 9. <br /> EXCAVATION AND SHORING MONITORING <br /> As with any shoring system, there is a potential risk of greater-than-anticipated movement of the <br /> shoring and the ground outside of the excavation. This can translate into noticeable damage of <br /> surrounding on-grade elements, such as foundations and slabs. Therefore, we recommend making <br /> an extensive photographic and visual survey of the project vicinity, prior to demolition activities, <br /> installing shoring or commencing excavation. This documents the condition of buildings, <br /> pavements, and utilities in the immediate vicinity of the site in order to avoid, and protect the owner <br /> from, unsubstantiated damage claims by surrounding property owners. <br /> Additionally, the shoring walls and any adjacent foundations should be monitored during <br /> construction to detect soil movements. To monitor their performance, we recommend establishing a <br /> series of survey reference points to measure any horizontal deflections of the shoring system. <br /> Control points should be established at a distance well away from the walls and slopes, and <br /> deflections from the reference points should be measured throughout construction by survey <br /> methods. At least every other soldier pile should be monitored by taking readings at the top of the <br /> pile. Additionally, benchmarks installed on the surrounding buildings should be monitored for at <br /> least vertical movement. We suggest taking the readings at least once a week, until it is <br /> established that no deflections are occurring. The initial readings for this monitoring should be <br /> taken before starting any demolition or excavation on the site. <br /> DRAINAGE CONSIDERATIONS <br /> We anticipate that permanent foundation walls may be constructed against the shoring walls. <br /> Where this occurs, a plastic-backed drainage composite, such as Miradrain, Battledrain, or similar, <br /> should be .placed against the entire surface of the shoring prior to pouring the foundation wall. <br /> Weep pipes located no more than 6 feet on-center should be connected to the drainage composite <br /> and poured into the foundation walls or the perimeter footing. A footing drain installed along the <br /> inside of the perimeter footing will be used to collect and carry the water discharged by the weep <br /> pipes to the storm system. Isolated zones of moisture or seepage can still reach the permanent <br /> wall where groundwater finds leaks or joints in the drainage composite. This is often an acceptable <br /> risk in unoccupied below-grade spaces, such as parking garages. However, formal waterproofing is <br /> typically necessary in areas where wet conditions at the face of the permanent wall will not be <br /> tolerable. If this is a concern, the permanent drainage and waterproofing system should be <br /> designed by a specialty consultant familiar with the expected subsurface conditions and proposed <br /> construction. <br /> GEOTECH CONSULTANTS,INC. <br />