My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY 2017 HOPEWORKS STATION 2 Geotech Report 2022-10-25
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
Geotech Report
>
3315 BROADWAY 2017 HOPEWORKS STATION 2 Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:37:08 PM
Creation date
12/21/2020 10:49:52 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Year
2017
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HopeWorks Social Enterprises JN 17298 <br /> July 12, 2017 Page 4 <br /> 58 to 59 feet at the eastern edge of the site, which corresponds to depths of 8 to 9 feet below the <br /> proposed bottom-of-excavation along the proposed building's eastern perimeter. However, <br /> medium-dense silt was exposed at an elevation of approximately 67 feet along the eastern property <br /> line, which is near the proposed excavation depth. Considering the varying soil conditions across <br /> the property, there are several foundation options: <br /> • The proposed building can be supported on conventional footing foundations bearing <br /> directly on the dense underlying slightly silty sand or on structural fill placed on top of these <br /> competent native soils. Overexcavation should be anticipated beneath approximately the <br /> eastern three-quarters of the building footprint to reach the competent dense slightly silty <br /> sand for this option. The overexcavation could extend as deep as 9 to 10 feet below the <br /> existing ground surface along the eastern property line. We recommend structural fill placed <br /> beneath foundations consist of 2- to 4-inch quarry or concrete spalls, 2-inch ballast rock, or <br /> lean-mix concrete. An allowable bearing pressure of 5,000 pounds per square foot(psf) can <br /> be used for this application. <br /> • Use the 5,000 psf bearing capacity for footings on the western third of the building where <br /> dense soil will likely be exposed at shallow depths, but for the eastern three-quarters of the <br /> building footprint, use footing foundations designed for an allowable bearing pressure of <br /> 2,000 psf — these footings would just bear on the upper native medium-dense silt <br /> encountered near the existing ground surface. The exact line of demarcation between <br /> bearing pressures will likely need to be determined by a qualified geotechnical engineer <br /> after the excavation for the building has begun. <br /> • Again use a 5,000 psf bearing capacity for the footings on the western third of the building, <br /> but support the eastern end of the building on a deep foundation system consisting of <br /> driven pipe piles or drilled piers. Additional recommendations can be found in the Pipe Piles <br /> section of this report. <br /> The silty nature of the soils encountered underlying the site makes them very moisture-sensitive. <br /> When wet, the silty sand and silt soils can become softened from equipment and foot traffic. <br /> Therefore, if foundations are constructed during wet weather, or when the soils are wet, it will likely <br /> be necessary to protect bearing surfaces with a layer on imported, clean crushed rock to prevent <br /> disturbance of the footing subgrades. The high fines content of the onsite soils make them very <br /> difficult to adequately compact; therefore, we recommend the onsite soils not be used as structural <br /> fill. <br /> Some amount of overexcavation should be anticipated beneath the proposed foundations to reach <br /> the competent dense native silty sand. Open excavations in the loose upper soils should be inclined <br /> no steeper than a 1:1 (Horizontal:Vertical) continuously from the top to the bottom of the cut. <br /> Temporary excavation easements onto the adjacent properties/right-of-ways may be necessary <br /> depending on the depth of the overexcavation and the proximity to the property lines. No open <br /> excavation should extend below a 1.5:1 (H:V) line extending downward from the base on any <br /> adjacent building footings. It would be prudent to determine an accurate bottom-of-footing elevation <br /> of the northern perimeter foundation of the existing HopeWorks building adjacent to the south to <br /> ensure that the building is not undermined by the excavation for the new building. In addition, as <br /> previously discussed, the northern adjacent YWCA building has an offset of 0.59 to 0.65 feet from <br /> the subject site and based on our observations, the bottom of the YWCA building's southern <br /> perimeter footing is approximately 2 to 3 feet above the existing ground surface of the subject site. <br /> An ecology block wall currently follows the northern perimeter of the subject site, providing lateral <br /> support to the YWCA building. Considering this, it appears the southern perimeter foundation of the <br /> YWCA building will need to be underpinned in order to complete the excavation for the proposed <br /> building. Underpinning can be completed with small-diameter pipe piles driven into the underlying <br /> GEOTECH CONSULTANTS,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.