My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 11/30/2020
>
Contracts
>
JOC
>
R.L. Alia Company 11/30/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 10:36:47 AM
Creation date
12/21/2020 12:48:29 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
11/30/2020
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Sidewalk Improvements 16th St & Chestnut
Public Works WO Number
2020-080
Tracking Number
0002599
Total Compensation
$136,000.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
Document Relationships
R. L. Alia 1/27/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\JOC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> responsibility and risk of all loss or damage to materials or work which may arise from any cause <br /> whatsoever prior to completion. <br /> This Contract is effective as of the date of the last person to sign it, and may be executed in multiple <br /> counterparts, each of which shall be deemed an original. <br /> CITY OF EVERETT, WASHINGTON CONTRACTOR <br /> 11.44/A" ALIA £MFqu/ <br /> Theresa Bauccio-Teschlog, Purc asing Manager [Contractor's Complete Legal Name] <br /> Date: <br /> APPROVED AS TO FORM: <br /> th (°i r AttC rn7y By: 1 tD4 <br /> TO FCP-ZM Typed/Printed Name: V t m A1-'4 <br /> City Attorney '.w _ "C. '�' City aar�� } Its (Title): Pee/be-VT <br /> Date: Date I/ /2.- to <br /> CITY OF EVERE • INGTON <br /> Cassie Franklin, Mayor <br /> Date: L( <br /> ATTEST: <br /> Sharon Fu er, City Clerk <br /> Date: /1--3 0 a'6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.