Laserfiche WebLink
lal <br /> CHANGE ORDER# <br /> EVERETT 0001 <br /> WASHINGTON <br /> Project(Procurement)Number: Small Works Roster Project Title: <br /> IFQ 2020-080 SIDEWALK IMPROVEMENTS- 16TH STREET & CHESTNUT STREET <br /> Description of Change:(Attach contractor's change proposal and cost schedule)(Attach Price or Cost Analysis) <br /> BUILDING/LOCATION:Corner of 10 and Chestnut Street — <br /> Asphalt failure has occurred parallel to design limits, offset approximately three feet along the wheel track of <br /> the eastbound lane. Change order will correct the asphalt failure per received quote. <br /> Failures, such as this one, are an unforeseen situation due to many factors. First,the native soil conditions <br /> under the roadway are unknown until a failure of the asphalt has occurred. Failures can occur quickly and <br /> without warnings when combined with construction activity,varying surface depths, the existing age of the <br /> roadway and the deterioration of roadway subgrades. <br /> Back-up documentation is attached. <br /> The changes described above,result in the following adjustment(s)in price and contract time(in calendar days). <br /> Completion <br /> j Change $136,000.00 Contract Time&Completion Date Prior to This 25 DatMOe Prior <br /> DAY <br /> •Total Project Price Prior to this Change 1 / <br /> YR <br /> •Net(Increase)or(Decrease)Resulting from this t$7,354.00 Net(Increase)or(Decrease)Resulting from 0 <br /> Change+ 5.'-\ 11. this Change <br /> Completion <br /> Contract Time&Completion Date Including Date After <br /> 'Total Project Price Including this Change $143,354.00 25 <br /> This Change MO/DAY/ <br /> YR <br /> By signing below City of Everett and the contractor acknowledge that this Change Order is issued under the provisions of the <br /> Contract established in response to the procurement listed above. This change in work is authorized within the scope of work set <br /> forth in the contract. All rights and obligations of the parties shall be subject to and governed by the terms and conditions, <br /> previously issued change order(s),amendment(s),and the signed contract including any subsequent modifications,are hereby <br /> incorporated by reference as if fully set forth herein. Any compensation in price or time established herein has been determined to <br /> be fair and reasonable by City of Everett. <br /> CONTRACTOR'S ACCEPTANCE CITY OF EVERETT APPROVALS <br /> R.L.Alia Company City of Everett <br /> 10831 SE 181'`ST 3200 Cedar Street <br /> Renton,WA 98055 Everett,WA 98201 Date <br /> Signature: Project Manager: (,-�rnlrIC. 1/242 1 <br /> __ Principal Engineer: ,d-i;onfria„T--/' (-2(-2-( <br /> • <br /> — Department Director: (22-Z <br /> on Sass <br /> W <br /> Print Name: 1 //�' Mayor: <br /> ",/O ,4 Cassie Franklin ,_! <br /> Name&Title: (//,✓'a /tat, p7- }'/4 Signature: <br /> Date: /Zr/ J <br /> ( IZi-J-u <br /> * WA Use Tax on materials included.WAC 458-20-171 <br /> AT (p,lhA <br /> TE <br /> c_i _ <br /> 7 City Clerk • w .r,;.yRj <br /> 1 <br />