Laserfiche WebLink
• • <br /> PUBLIC WORKS <br /> operations manual shall be retained on-site or within reasonable access to the site and <br /> shall be transferred with the property to any new owner. A log of maintenance activities <br /> that indicate what actions were taken shall be kept and available for inspection by the City <br /> of Everett upon request. <br /> Special Reports: If possible,please provide an electronic copy of the geotechnical report. <br /> b. Specific Plan Review comments: <br /> The plans must be consistent with the applicable standards and details in Section 4 of the <br /> City's Design and Construction Standards. This document can be found at the following <br /> web address: <br /> https://everettwa.gov/1531/Design-Construction-Standards <br /> The details of the control structure and restrictor unit must meet City standards—(i.e., <br /> drawing numbers 415 and 416 of the City's Design and Construction Standards and <br /> Specifications(DCSS)). <br /> SDCB#11 must be a catch basin meeting City standards. <br /> Storm drains that have been abandoned and/or are no longer active should not be shown <br /> on the Area A and B storm drainage and utility plans. Otherwise, these pipes will end up <br /> in the City's GIS database and make it even more difficult to figure out what's draining <br /> where...L <br /> The following performance standard for BMP T5.13 shall be included on the storm <br /> drainage plans: <br /> BMP T5.13: Post-Construction Soil Quality and Depth <br /> Soil Quality: All areas subject to clearing and grading that have not been covered by hard <br /> surfaces, incorporated into a drainage facility, or engineered as structural fill or slope shall <br /> demonstrate the following at project completion: <br /> 1) A topsoil layer with a minimum organic matter content of 10% dry weight in planting <br /> beds and 5% organic content in turf areas,with a pH from 6.0 —8.0 or matching the <br /> pH of the undisturbed native soil. <br /> 2) The topsoil layer shall have a minimum depth of eight inches except where tree roots <br /> limit the depth of incorporation of amendments needed to meet the criteria. <br /> 3) Subsoils below the topsoil layer shall be scarified at least four inches with some <br /> incorporation of the upper material to avoid stratified layers, where feasible. <br /> 4) Planting beds shall be mulched with 2 inches of organic material. <br /> 3. The comments below were generated from this project's Planning Reviewer. If you have any <br /> questions regarding these comments, please contact Niels Tygesen with the City of Everett <br /> Planning Department (425-257-7168 or NTygesen@everettwa.gov). <br /> a. A review of this permit and plan set has found elements that do not satisfy Everett Municipal <br /> Code (EMC) Zoning regulations and require amendments prior to Planning approval: <br /> Page 4 of2) <br />