My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2235 LAKE HEIGHTS DR 2020-12-23
>
Address Records
>
LAKE HEIGHTS DR
>
2235
>
2235 LAKE HEIGHTS DR 2020-12-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 11:17:36 AM
Creation date
12/23/2020 11:10:11 AM
Metadata
Fields
Template:
Address Document
Street Name
LAKE HEIGHTS DR
Street Number
2235
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 11.0 Financial/Ownership Responsibilities 1 <br /> The Bethany of the Northwest is the party responsible for initiation of bonds and other financial <br /> securities. The project must comply with City of Everett financial liability requirements. <br /> 12.0 Certified Erosion and Sediment Control Lead (CESCL) <br /> The General Contractor shall be required to provide a CESCL prior to construction. Once this <br /> individual is identified, the City Inspector will be notified. <br /> The contractor will designate their CESCL here: I <br /> Name: <br /> Address: <br /> Phone: <br /> Fax Number: <br /> The CESCL is required to meet Washington State Department of Ecology(DOE)certification <br /> requirements. The City Inspector will be provided with CESCL information. <br /> The duties of the CESCL include: <br /> • Implement the CSWPPP/TESC plan with the aid of the SWPP Team. <br /> • Oversee maintenance practices identified as BMPs in the CSWPPP. I <br /> • Conduct or provide for inspection and monitoring activities. <br /> • Sample stormwater for turbidity using a turbidity meter. I <br /> • Identify other potential pollutant sources and make sure they are added to the plan. <br /> • Identify any deficiencies in the CSWPPP and make sure they are corrected. <br /> • Ensure that any changes in construction plans are addressed in the CSWPPP. I <br /> To aid in the implementation of the CSWPPP, the members of the SWPP Team include the <br /> following: General Contractor, City of Everett Inspector, Owner, the geotechnical engineering <br /> consultant, and AHBL. <br /> The General Contractor will ensure that all housekeeping and monitoring procedures are <br /> implemented, while the CESCL will ensure the integrity of the structural BMPs. The SWPP Team <br /> will observe construction and erosion control practices and recommend revisions or additions to <br /> the CSWPPP and drawings. <br /> i <br /> 1 <br /> Construction Stormwater Pollution Prevention Plan 000 <br /> atSerke 10 <br /> 2180406.10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.