8.13 Protect Low Impact Development BMPs <br /> This project does not contain low impact development BMPs. Therefore, this element does not <br /> apply to this project. <br /> 9.0 Construction Sequence and Phasing <br /> 9.1 Construction Sequence <br /> The construction sequence is described below: <br /> 1. Attend a pre-construction meeting with the City of Everett. <br /> 2. Stake/flag clearing and construction limits. <br /> 3. Construct all temporary erosion control BMPs according to the TESC plan. Install inlet <br /> sediment protection in existing catch basins. <br /> 4. Pothole existing utilities where indicated on plans and as necessary. <br /> 5. Demolish existing site features indicated for removal. <br /> 6. Maintain erosion control measures in accordance with the Washington State Department of <br /> Ecology 2014 Stormwater Management Manual for Western Washington (SMMWW) <br /> recommendations. <br /> 7. Rough grade site. All grading shall be done in accordance with the grading plan. <br /> 8. Construct storm system and install inlet sediment protection to new catch basins. <br /> 9. Apply erosion control mulch and seeding, straw mulch or equal, to areas that will not be <br /> brought to final grade or permanently vegetated within 7 days of exposure during the dry <br /> season, and 2 days of exposure during the wet season (October 1 —April 30). <br /> 10. Relocate erosion control measures or install new measures so that, as the site conditions <br /> change,the erosion and sediment control is always in accordance with the SWPPP <br /> minimum requirements. <br /> 11. Final grade site and install surface treatments. Ensure that surface water is positively <br /> directed toward proposed storm collection facilities and away from the building. <br /> 12. Remove remaining temporary erosion control items once site has been stabilized and upon <br /> approval from the City of Everett. <br /> 9.2 Construction Phasing <br /> The project is anticipated to be constructed in a single phase. <br /> 10.0 Construction Schedule <br /> Construction is scheduled to begin in spring of 2019. Completion of the final project phase will be <br /> Ibased on market conditions, but mass grading activities will be primarily limited to the dry season. <br /> Construction Stormwater Pollution Prevention Plan <br /> The Bethany at Silver Lake 9 01300 <br /> 2180406.10 <br />