Laserfiche WebLink
ti <br /> • S <br /> 6. Exit Analysis-This project is a major expansion of the current footprint. An exiting <br /> analysis will need to be performed as to requirements of the 2015 IBC and IFC <br /> 7. Site Plan-With the additions the room numbering needs to be shown on plans as well as <br /> directional signs that will be placed to direct first responders. A paper plan for review and <br /> a final electronic copy showing the room numbering and location of fire protection <br /> equipment will need to be provided to the fire department. <br /> 8. A copy of NFPA 72 Record of Completion form must be filled out prior to final occupancy <br /> (NFPA 72, 2013 Edition, Chapter 7, pages 107-147). 2015 IFC, 907.7.2 <br /> 1 <br /> Planning: Niels Tygesen,425.257.8731 <br /> 1. A landscape plan will be required at time of building permit submittal.The landscape plan <br /> must be prepared by professionals licensed or certified in Washington State, such as <br /> licensed landscape architects, architects, engineers,or certified professional horticulturists, <br /> nurserypersons, or landscape designers. <br /> The proposed new parking area adjacent to 2129 Lake Heights Drive must meet current <br /> landscape requirements of EMC Title 19 Chapter 35,for street frontage, interior lot lines, <br /> and off-street parking areas. <br /> If the value of the new construction is equal to or greater than thirty-five percent of the <br /> assessed value of the existing skilled nursing structure,the entire site of Lot 1 must meet <br /> current landscape requirements of EMC Title 19 Chapter 35. <br /> 2. A two-year maintenance assurance device will be required for all new landscaping. <br /> 3. The surfacing of the new parking area and the existing parking area with new paving at the <br /> new storm water area must be of a durable surface material as approved by the City <br /> Engineer and Planning Director. <br /> Revl 18-037 Page 7 of 7) <br />