My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/12/16 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/12/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 5:55:18 PM
Creation date
12/30/2020 2:32:57 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fig. 1: Examples of How Far You Could Go at Midday in 15, 30, 45, or 60 Minutes <br />2015 <br />Source: King County Metro CONNECTS (2016) <br />Task 3.1- Everett Transit Long Range Plan <br />20L <br />0 <br />J <br />ire <br />II. <br />i <br />A significant level of effort has already been invested in understanding the dimensions of implementing <br />the "Growth Network" outlined in the Long -Range Plan. However, there are topics that have arisen <br />since plan adoption that need to be further investigated and understood. These include the need to <br />update forecasts of ca pita l and operating cost of incremental growth through 2040 in annual <br />increments, 2020-2040. This will allow consideration of what the fixed route network might look like <br />when light rail reaches Everett, presently planned for the last time period (Sound Transit is presently <br />projecting 2036). Some of the detailed issues include: <br />1) Capital— defined annually <br />a) Funding alternatives —What grant funding alternatives and opportunities are realistic and <br />what might be the magnitude and timing of those? <br />b) Revisit needs and capacity of a re -constructed, annex, or new Maintenance and Operations <br />Base <br />c) Administrative space needs <br />d) Fleet replacement and expansion including updated assessment of electric bus options <br />e) Financial participation in Swift Blue line and potential Red line <br />2) Operating — defined by the planning milestones, 2024 and 2036. <br />a) Staffing assumptions for operators, supervisors, mechanics, support staff <br />b) Hours, miles, and fleet estimates for each five year period <br />c) Energy costs — assuming transition to 100% electric <br />d) Operating cost participation in Swift lines and paratransit "Green Zone" <br />e) Network changes to adapt to Link extension into Snohomish County and Stride (Sound <br />Transit's freeway -based Bus Rapid Transit or BRT) implementation on SR-522 and 1-405 <br />f) Confirmation of ADA Pa ratra ns it operating plan <br />Page 11 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.