My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/12/16 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/12/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 5:55:18 PM
Creation date
12/30/2020 2:32:57 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E EVERETT <br />Project title: SEI to SRI Intertie and SRO8 Rehabilitation Project; Call for bids <br />City Council Agenda Item Cover Sheet <br />Council Bill # <br />Agenda dates requested: <br />December 16, 2020 <br />Briefing <br />Proposed action <br />Consent X <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />None <br />Department(s) involved: <br />Public Works <br />Contact person: <br />Dave Voigt <br />Phone number: <br />425-257-8983 <br />Email. <br />dvoigt@everettwa.gov <br />Initialed by: <br />Z LS <br />Department head <br />Admmistr <br />Cound President <br />Project: SEI to SRI Intertie and SR08 Rehabilitation <br />Partner/Supplier : NA <br />Location: 36th Street at Eclipse Mill Rd (Riverfront, adjacent to Eclipse Mill Park) <br />Preceding action: Funding Ordinance No. 3735-20, 3/11/2020 <br />Fund: 336 — Water & Sewer System Improvements Fund <br />Fiscal summary statement: This project is included in the current Public Works Capital <br />Improvements Program for Sewer infrastructure. The estimated construction cost is <br />approximately $1,400,000. <br />Project summary statement: SEI (South -End Interceptor) to SRI (Snohomish River <br />Interceptor) are existing parallel, large -diameter pipes (48" and 72' diameter <br />respectively) extending from 36th St. to the Water Pollution Control Facility (WPCF) <br />including a crossing at the Snohomish River. SEI conveys all sewer flows from south - <br />Everett (separated) and the SRI conveys wet weather combined sewer flows. This project <br />will construct a 30" diameter pipe connection between these two interceptors. The <br />intertie connection will primarily enable City Maintenance and Operations to perform <br />repairs, inspection or maintenance of the 48" SEI pipeline and enables other sewer <br />conveyance improvements to be performed. <br />The SRO8 (Snohomish River Outfall 8) is over 100 years old and is badly deteriorated. <br />This project will rehabilitate the pipe by trenchless methods to restore its reliability and <br />provide improvements for future inspection and maintenance. <br />Recommendation (exact action requested of Council): Authorize call for bids for <br />construction of SEI to SRI Intertie and SRO8 Rehabilitation project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.