• <br /> KP Roof Repairs and Rooffprovements Project Section 07500 <br /> Community Transit, ITB#2019-028 Single Ply Membrane <br /> F. Applicator shall be responsible for acceptance or provision of proper substrate to receive new <br /> roofing material. <br /> G. Contractor shall fill seams and joints between the structural deck and vertical transitions with <br /> manufacturer approved expandable foam prior to installation of the vapor retarder. <br /> 3.06 FLUTE FILLER INSTALLATION <br /> A. Remove all moisture from within the flutes. <br /> B. Install expanded polystyrene (EPS)flute filler to tightly conform to existing flutes and provide <br /> a continuous flat roof surface, flush with the top surface of the existing sheet metal flutes. <br /> 3.07 COVERBOARD INSTALLATION <br /> A. Set specified coverboard in place and mechanically fasten with screws and three 3-inch <br /> plates per project uplift requirements. Screws shall penetrate the upper flutes only of the <br /> metal deck a minimum 3/4 inch and no more than 1% inches. Install with long joints in <br /> continuous straight lines, perpendicular to roof slopes with end joints staggered between <br /> rows. Tightly butt boards together. <br /> B. At vertical transitions, mechanically fasten vertical coverboard as required to provide an <br /> acceptable substrate for flashing membrane installation. <br /> 3.11 SINGLE PLY MEMBRANE INSTALLATION <br /> A. Fully adhere the single ply roofing membrane over areas to receive roofing according to <br /> membrane roofing system manufacturer's written instructions. Unroll roofing membrane and <br /> allow to relax before installing. <br /> 1. Do not allow any asphalt-based product (including but not limited to asphalt roof cement <br /> and various self adhering membranes) to come in direct contact with the single ply field <br /> and baseflashing membrane at any location, unless written approval is provided by the <br /> roof system manufacturer. <br /> B. Gutter Liners: Fully prepare substrates to receive new single ply gutter liners, fully adhered. <br /> Fully seal all transitions, seams,joints, and pinholes with heat welded single ply membrane. <br /> C. Accurately align roofing membrane and maintain uniform side and end laps of minimum <br /> dimensions required by manufacturer. Stagger end laps. <br /> D. Apply bonding adhesive to substrate and underside of roofing membrane at a rate required <br /> by the manufacturer. Do not apply adhesive to splice/lap areas of roofing membrane. <br /> E. Mechanically fasten roofing membrane securely at terminations, penetrations, and perimeter <br /> of roofing as required by the manufacturer. <br /> F. Apply roofing membrane with side laps shingled with slope of roof deck where possible. <br /> G. Seams: Clean seam areas, overlap roofing membrane, and hot-air weld side and end laps of <br /> roofing membrane according to manufacturer's written instructions to ensure a watertight <br /> seam installation. <br /> 1. Complete welding of seams within 24 hours of exposing CSPE sheet or before curing of <br /> CSPE sheet has begun. <br /> 2. Test lap edges with probe to verify seam weld continuity. <br /> 3. Verify field strength of seams a minimum of twice daily and repair seam sample areas. <br /> Contractor to provide written documentation of field test of membrane seam welds and <br /> notify the owner, owner's representative, and manufacturer immediately if the seam <br /> adhesion is less than required by the manufacturer. <br /> Construction Documents <br /> 07500-10 <br />