Laserfiche WebLink
r S • <br /> KP Roof Repairs and Roof Improvements Project Section 07600 <br /> Community Transit, ITB#2019-028 Sheet Metal Roofing and Siding <br /> PART 1 -GENERAL <br /> 1.01 DESCRIPTION <br /> A. Sheet metal roofing and siding to consist of factory formed and field assemblies through- <br /> fastened prefinished metal roof and wall panels, and integral transition flashing, components, <br /> and accessories as required to provide a complete, weather-tight assembly. <br /> 1. KP-C South Canopy: New sheet metal siding, related flashing transitions, and structural <br /> improvements <br /> 2. KP-Fuel Island: New sheet metal siding and related flashing transitions <br /> 3. KP Vault: New sheet metal roofing, related flashing transitions, and structural <br /> improvements <br /> 1.02 RELATED SECTIONS <br /> A. Division 1 General Requirements <br /> B. Division 7 Section 07500"Single Ply Membrane Roofing" <br /> C. Division 7 Section 07620"Sheet Metal Flashing" <br /> 1.03 REFERENCES <br /> A. SMACNA, Architectural Sheet Metal Manual (5th Addition) <br /> B. NRCA Roofing and Waterproofing Manual (5th Addition) <br /> 1.04 PERFORMANCE REQUIREMENTS <br /> A. Fire Resistance: Minimum UL Class B Exposure <br /> B. Uplift Resistance: ASCE 7-10, meet minimum 115 MPH peak wind velocity, open structure, <br /> Exposure B. Also conform to UL Class 90 fastening pattern requirements. <br /> C. Sheet metal panels shall meet UL Class 90 certification. <br /> 1.05 SUBMITTALS <br /> A. Product data and MSDS: Submit the name of the manufacturer, specification numbers, color <br /> samples for exposed products, and product names of all materials proposed for use in the <br /> work. Include in submittal installation instructions and general recommendations for each <br /> principal product required. Include data substantiating that the materials comply with <br /> requirements. <br /> B. Shop Drawings: Show installation layout of sheet metal flashing and trim, including plans, <br /> elevations, and keyed details. <br /> C. Attachment Schedule: The roof system manufacturer and/or approved structural engineer <br /> shall provide an attachment schedule and supporting calculations to meet project performance <br /> requirements. <br /> D. Samples: Submit 6"x6"sample of prefinished sheet metal to be utilized in flashing transitions. <br /> E. Tear Off: Submit tear-off work plan. <br /> Construction Documents <br /> 07600-1 <br />