Laserfiche WebLink
KP Roof Repairs and Roof Improvements Project Section 07500 <br /> Community Transit, ITB#2019-028 Single Ply Membrane <br /> D. Additional testing and inspecting, at Contractor's expense, will be performed to determine <br /> compliance of replaced or additional work with specified requirements. <br /> 3.18 PROTECTING AND CLEANING <br /> A. Protect membrane roofing system from damage and wear during remainder of construction <br /> period. When remaining construction will not affect or endanger roofing, inspect roofing for <br /> deterioration and damage, describing its nature and extent in a written report, with copies to <br /> Architect and Owner. <br /> B. Correct deficiencies in or remove membrane roofing system that does not comply with <br /> requirements, repair substrates, and repair or reinstall membrane roofing system to a <br /> condition free of damage and deterioration at time of Substantial Completion and according <br /> to warranty requirements. <br /> C. Clean overspray and spillage from adjacent construction using cleaning agents and <br /> procedures recommended by manufacturer of affected construction <br /> END OF SECTION <br /> Construction Documents ,. 3 07500-13 ) 2_,o` <br />